Category Archives: Mechanical Method Statement

Fire Sprinkler System Installation Testing and Commissioning Method Statement

This procedure covers installation, pressure testing and functional commissioning of firefighting sprinkler system. Method statement covers an integrated system of underground and overhead piping designed in accordance with fire protection engineering standards. This method covers portion of the sprinkler system above ground in a network of specially sized OR hydraulically designed piping installed in a… Read More: Fire Sprinkler System Installation Testing and Commissioning Method Statement »

Method Statement for Manhole Construction

The purpose of this method statement is to define the procedure for the construction of manhole in accordance with the requirements specified in the relevant project specifications and drawings. This method statement should be implemented in conjunction with MEP method statement for pipe laying. All the procedures shall comply with the requirements of the municipality… Read More: Method Statement for Manhole Construction »

Closed Control Unit CCU Air Conditioning Unit Installation Method Statement

This method statement covers the installation of floor mounted Close Control Units CCU with down flow air delivery serving the room. Following this procedure will ensure the CCU installation has been carried out as per project/contract specifications and manufacturer’s recommendations. The mechanical method statement gives details of how the work will be carried out and… Read More: Closed Control Unit CCU Air Conditioning Unit Installation Method Statement »

Condensate Drain Piping Installation and Testing Method Statement

This method statement is applicable for Installation, testing  & insulation of condensate drain piping and its accessories. The scope of work covers all areas where applicable inside the buildings from hvac equipment’s and in the roof areas as applicable. Drain piping installation shall be done as per the latest approved shop drawings for the required… Read More: Condensate Drain Piping Installation and Testing Method Statement »

Extractor Ventilation Exhaust Fan Installation Method Statement

This method statement covers the procedure or sequence of installation of Ventilation & Exhaust Fans in different areas and for different types of fans. The procedure is applicable for any kind of HVAC project. Overall project manager and project mechanical engineer are responsible for the implementation of this procedure. The exhaust fans installation shall be… Read More: Extractor Ventilation Exhaust Fan Installation Method Statement »

Method Statement for HVAC Air Balancing and Air Flow Measurement

Table of Content 1. INTRODUCTION 2. PREREQUISITES TO PROCEDURE 2.1 Access / Egress 2.2 Responsibilities / Supervision 2.3 Requirements 2.4 Personal Protective Equipment 3. DESIGN PERAMETERS 3.1 Specification Reference 3.2 Drawing Reference 4. REFERENCE DOCUMENTS 4.1 Relevant Commissioning Codes 5. PRE-COMMISSIONING / PRE START CHECKS 5.1 Static Checks 6. COMMISSIONING / TEST PROCEDURES 6.1 Starting… Read More: Method Statement for HVAC Air Balancing and Air Flow Measurement »

Fan Coil FCU Unit Installation Method Statement

Below is a precise method statement for fan coil unit FCU installation for any kind of project. Project manager is overall responsible for the implementation of this method and all applicable standards, specifications and manufacturer instructions for the FCU installation. Site engineer/ supervisor shall make sure that all necessary documentation work is approved, shop drawings/… Read More: Fan Coil FCU Unit Installation Method Statement »

Water Heater Installation | Geyser Installation Method Statement

This page gives a brief method statement for water heater installation or geyser installation in compliance with the approved design, drawings, approved material submittals and project specification. Prior to installation of Water Heater, the supervisor and foreman will verify and ensure that all the safety requirements have been complied and necessary control measures are in… Read More: Water Heater Installation | Geyser Installation Method Statement »