Category Archives: Mechanical Method Statement

HDPE Piping System Underground Construction Method

The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements. Scope of work for this method statement includes handling, storage, delivery, installation instructions… Read More: HDPE Piping System Underground Construction Method »

Method Statement for Firefighting Piping Equipment and Accessories Installation

This method statement for fire fighting system covers below activities: Piping system installation Fire fighting equipment and accessories installation Installation of pumps Flushing/Cleaning of piping and equipment Installation of fire detection system and accessories Quality of installation and materials at site will be ensured by project team consisting of a Project Manager, Project Engineers, QA… Read More: Method Statement for Firefighting Piping Equipment and Accessories Installation »

Fabrication and Erection of Hot dip Galvanized Primary and Secondary Steel Structure

This procedure describes the minimum requirements that shall be observed at site for handling and storing materials, erection of hot dip galvanized primary and secondary steel structure to be installed. It also covers the tests and inspections that are to be carried out during the execution of the fabrication, erection and assembly works. This procedure… Read More: Fabrication and Erection of Hot dip Galvanized Primary and Secondary… »

Method Statement for Drainage Sewage Piping Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer sewage piping lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications considering safety and quality of the work activities. Scope of work is as below:… Read More: Method Statement for Drainage Sewage Piping Works »

Air Cooled Condenser Erection and Assembly Method Statement

This document describes the methods proposed to be used for the erection operations related to the air cooled condenser for any kind of plant project. Method statement identifies the general steps, arrangements and precautions for the assembly and erection works of ACC. This method statement also defines piping erection of all control equipment at the… Read More: Air Cooled Condenser Erection and Assembly Method Statement »

Fire Sprinkler System Installation Method Statement

Below method statement covers the method and procedures for installation of fire fighting sprinkler pipe works inside the building. The method of statement is applicable to all internal fire fighting pipes, riser works and sprinklers. Reference Documents: Approved Drawings. Project Specification. NFPA 13 section 10-2.2. Necessary Tools and Equipment Measuring Tape Grooving Machine Threading Machine… Read More: Fire Sprinkler System Installation Method Statement »

Chemical Flushing for Chilled Water System

Below is a detailed chilled water pipe flushing procedure that covers cleaning, flushing and chemical treatment requirements for an existing or new project. Flushing of chilled water system shall be done as per the guidelines and requirements mentioned in the project specifications and relevant drawings etc. Also instructions given from the chemical manufacturer and suppliers… Read More: Chemical Flushing for Chilled Water System »

Method Statement for Stormwater Drainage

Below is precise method statement for drainage works covering sanitary, vent and stormwater pipes. Stormwater drainage is an important system for any kind of construction project. This plumbing method statement covers the installation of sanitary, vent and stormwater drainage piping system. The purpose of stormwater drainage installation procedure is to ensure that drainage and vent… Read More: Method Statement for Stormwater Drainage »