This standard document describes the permit to work system to control potentially high risk hot work operations through the issue of a Hot Work Permit. By implementing this safe work instruction organization shall ensure a safe place to work when undertaking hot
Read More
This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital
Read More
Below standard work instruction addresses the training of new boom truck operators including the refresher awareness and training of experienced operator. This instruction applies to all operators of boom trucks on construction project sites. All Boom Truck operators must hold a valid
Read More
This procedure describes the requirements on the notification, classification and reporting of all HSE accidents and incidents in order to ensure that notification and reporting of all accidents, incidents, diseases and dangerous occurrences is conducted in accordance with the requirement of the
Read More
Project safety training is mandatory for all project personnel. Safety training program is completed on the projects in accordance with the requirements of documented training procedure of an organization. Here we are identifying some necessary requirements. The Management of Health and Safety
Read More
Below is a steps wise risk management process that consists of hazard identification, risk assessment, risk control, analysis and improvement. The overall responsibility for the implementation of this procedure is with the project manager and safety and other department heads. Below are
Read More
General Safety Statement Everyone who comes to work in the morning has the right to go home safely at the end of the duty / shift. It is essential that the“Walk the Talk” approach be the Primary objective to executing a task
Read More
This method statement provides the details of the materials, the equipment, the procedure and relevant documents related to the Rock Blasting activity, including the quality control verifications, the measurement verifications, and also the safety precautions to be implemented for this work. Location
Read More