Category Archives: EHS Environmental Health and Safety

Rock Blasting Method Statement

This method statement provides the details of the materials, the equipment, the procedure and relevant documents related to the Rock Blasting activity, including the quality control verifications, the measurement verifications, and also the safety precautions to be implemented for this work. Location of Works The location of the rock blasting works will be limited to… Read More »

Haul Truck / Dump Truck Safety, Loading and Dumping Procedure

The purpose of this construction safety procedure is to provide safe operating instructions for haul truck and dump truck operators working on any kind of projects including building and road construction machinery. This Instruction applies to projects and offices where a company operates and areas where haul trucks are in use. Project manager and project… Read More »

Construction Machinery Maintenance & Operation Procedure for Excavator

Below is best procedure for heavy equipment operation and maintenance that will provide safe operating instructions for excavator operators working on any kind of projects. Overall project manager and HSE team leader have responsibilities for the implementation of this standard safety procedure. All excavator operators must, hold a valid accredited 3rd party competence certificate and… Read More »

Toolbox Talk Topics for 19 Activities

Below we have listed 19 toolbox talk topics with briefing which should take place during the daily safety meeting. Below is table of content which is covered in this post about the safety meeting topics. Sun Safety Work at height Mobile scaffolds Portable electric equipment Coshh PPE-Head PPE-Hand PPE-Foot PPE-Hearing PPE-Eye Accident reporting Fire Precautions… Read More »

Method of Statement for Structural Excavation and Backfilling

The purpose of this method statement is to define the standard work process for Structural Excavation and Backfilling related activities. Method of statement addresses work operation associated with structural excavation and backfilling. All necessary setting out, tree cutting, clearing and grubbing will be completed prior to performing this operation. This work consists of excavation for… Read More »

Workplace Smoking Policy for Construction Company

It is the Company’s policy that all of its workplaces are smoke-free and that all employees have a right to work in a smoke-free environment and not be exposed to second-hand smoke. This is also a statutory requirement. As such, the Company’s business premises are no smoking premises and smoking is prohibited in all areas… Read More »

Construction Project Site Clearance Method

The purpose of this method is to give guidance for the clearing operation for all site areas where clearing is required. Instruction applies to all areas and is not limited to clearing for dump areas, haul roads and pits. This safework instruction takes into account all aspects of this activity including operation, production, safety, environment… Read More »

Demolition Method Statement for Covered Walkway

Below is a brief method statement that is for the demolition of existing covered walkway. Existing structure shall be removed completely, which is a cantilevered structure supported by steel elements and covered with roof tiles. Below is list of equipment for demolition works: Skip Tank Oxygen Acetylene cutting torch Electric Concrete breaker Mini- excavator Preparatory… Read More »