Category Archives: Mechanical Method Statement

Method Statement for 1” Fire Hose Reel System and 1 ½” Fire Hose System Installation

This method statement covers installation and inspection of 1” Fire Hose Reel System and 1 ½” Fire Hose System which is part of overall firefighting system. Purpose of this method of statement is to define the method of installation and inspection of Fire Fighting Hose Reel System. Quality of installation and materials at site will… Read More: Method Statement for 1” Fire Hose Reel System and 1… »

Refrigerant Copper Piping Installation Method Statement

The purpose of this mechanical method statement is to identify the requirements/methodology for installation of refrigerant copper piping as per the contract specification, drawings and as per the applicable regulations if any. This method statement is applicable to all activities related to installation of refrigerant copper piping for Ducted Split and Decorative Units. The implementation… Read More: Refrigerant Copper Piping Installation Method Statement »

Hydrotest Pipe Pressure Testing Procedure

This mechanical method statement section applies to the hydrostatic testing of new fabricated and installed stainless steel SS pipelines associated with a construction or pipeline project. After completion and approval of all welding, radiography and NDT requirements/ activities the piping system shall be hydrostatically pressure tested. The site supervisor shall obtain relevant safety permits to… Read More: Hydrotest Pipe Pressure Testing Procedure »

Natural Gas Piping Installation Method Statement

This procedure is applicable to all natural gas pipeline underground installation works at any kind of project and aims to ensure that all works are carried out to comply with the applicable acts, regulations and by laws i.e. Local and international code of Practice for the Installation of Fuel Gas Piping Systems and Appliances, Occupational… Read More: Natural Gas Piping Installation Method Statement »

Sewer System Sewerage Piping Installation & Testing Method Statement

All the piping materials received at site will be inspected, upon receipt on the project site. Any discrepancies / damages should be notified and reported to the supplier for further action. Materials found not suitable for site use will be removed from site immediately. All construction/inspection/testing works shall be carried out in accordance with project… Read More: Sewer System Sewerage Piping Installation & Testing Method Statement »

BMS Building Management System Installation Method Statement

This method statement covers the site works for the building management BMS system installation as per approved material submittal and site requirements for the projects. All documentary requirements for this installation work will be submitted for approval and this will include Manufacturers data, certificate of compliance, brand designation, type and class including samples. QA/QC team… Read More: BMS Building Management System Installation Method Statement »

Method Statement for Air Conditioner Equipment (FCU, AHU, FAHU & Fans) Installation

Below is a precise method statement that describes the steps for the installation of air conditioner equipment in a central AC system like exhaust fans, AHU, FCU and FAHU etc. HVAC equipment installation involves working on height that requires strict health and safety measures, which are briefly explained in below section. Modular Supervisors and foremen… Read More: Method Statement for Air Conditioner Equipment (FCU, AHU, FAHU &… »

HVAC Air Distribution System Duct Work Installation Insulation and Cladding Method of Statement

Purpose of this mechanical procedure is to define the sequence and methodology for all critical installation activity pertaining to HVAC air distribution system i.e. ductworks for any kind of construction project building with contract scope of work, applicable standards and drawings. The scope of work includes AC units with chilled water piping connected with ductworks,… Read More: HVAC Air Distribution System Duct Work Installation Insulation and Cladding… »