Rock Blasting Method Statement

This method statement provides the details of the materials, the equipment, the procedure and relevant documents related to the Rock Blasting activity, including the quality control verifications, the measurement verifications, and also the safety precautions to be implemented for this work. Location of Works The location of the rock blasting works will be limited to… Read More »

RCC Work Building Construction Method Statement

Below is a precise RCC work building construction method statement that covers Casting of Foundation, Neck column, Tie beam, Grade Slab, Columns, Core & shear walls, Beams & Suspended Slab according to specified drawings and quality standards. The contractor’s approved shop drawing for RCC structural elements shall be available for inspection by the consultant engineer.… Read More »

Job Description of Technical Department Manager Civil Construction Company

Lead the department activities related to projects and corporate office / head office. Raise suggestions to improve the system of working within the project and the company. Follow the relevant procedures of the quality management system. Raise NCR to the non-conforming procedures and practices in the department. Receive all the contract documents i.e. Contract Conditions… Read More »

Chemical Flushing for Chilled Water System

Below is a detailed chilled water pipe flushing procedure that covers cleaning, flushing and chemical treatment requirements for an existing or new project. Flushing of chilled water system shall be done as per the guidelines and requirements mentioned in the project specifications and relevant drawings etc. Also instructions given from the chemical manufacturer and suppliers… Read More »

Introduction to Excavation and Use of Heavy Equipment for Basement Construction

In general, excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include backfilling with new or original materials to voids, spreading and levelling over an area. British Standard CP6031 gives standards and recommendation to earthworks covering embarkment and cuttings, levelling and… Read More »

Method Statement for Stormwater Drainage

Below is precise method statement for drainage works covering sanitary, vent and stormwater pipes. Stormwater drainage is an important system for any kind of construction project. This plumbing method statement covers the installation of sanitary, vent and stormwater drainage piping system. The purpose of stormwater drainage installation procedure is to ensure that drainage and vent… Read More »

Copper Pipe Installation Method of Statement for Water Supply

Below plumbing method statement describes the procedure for the installation of copper pipe for domestic water services (hot & cold) inside buildings for any kind of the building construction project. Overall project manager is responsible for the implementation of this copper pipe installation method statement. By following this MOS project team will ensure that plumbing installation… Read More »

Electrical Switchgear Installation Method Statement for 11KV HV Panel

Below is a precise method of statement for electrical works, that explains and covers the installation & inspection of 11KV switchgear panels on already approved and ready base/plinth. Switchgear installation shall be done in compliance with the project electrical specifications and switchgear manufacturer instructions. Other documents, codes and references are given below that must be… Read More »