Method Statement for Installation of Earthing & Lightning Protection System

This  electrical method  statement covers the nature and type of work for  the Earthing  & Lightning Protection System installation as per site requirements for the project. The piles and vertical re-bars are provided with connections for Earthing & Lightning Protection System installation by main contractor. Any core drilling, chipping, excavation and back filling work required… Read More: Method Statement for Installation of Earthing & Lightning Protection System »

Hot Work Permit System HSE Management Procedure – PTW Permit To Work System

This standard document describes the permit to work system to control potentially high risk hot work operations through the issue of a Hot Work Permit. By implementing this safe work instruction organization shall ensure a safe place to work when undertaking hot works on any type and size of project. Additional control measures may be… Read More: Hot Work Permit System HSE Management Procedure – PTW Permit… »

Gl Conduits & Accessories Installation for Electrical and ELV Services

On this page you shall find method statement for electrical conduit installation. This  electrical method statement covers the nature and type of work for the Gl conduits & accessories installation for the following systems as applicable on the projects. Lighting Control Small Power Data & Voice (telephones) Security Access Control Electrics to Mechanical Services BMS/Automatic… Read More: Gl Conduits & Accessories Installation for Electrical and ELV Services »

Trench Preparation Excavation and Backfill Method Statement for Electric Underground Cable Laying

The purpose of this document is to specify the procedure for excavation backfilling and trench preparation for installation of 132 kV cables and fiber optic Cables. Roles & Responsibilities Project Manager: Lead all construction activities and enforce strict adherence to all procedures. Site Manager: Lead the construction activities at site and report to the Project… Read More: Trench Preparation Excavation and Backfill Method Statement for Electric Underground… »

Testing & Commissioning Method Statement for Footfall Visitor Counting System

The user acceptance tests will demonstrate that the system and related materials have been correctly installed and that the footfall system will operate in a manner that will enable client to accept it as a working system and proceed with the process of using it. Purpose of the User Acceptance Tests (UAT) in this document… Read More: Testing & Commissioning Method Statement for Footfall Visitor Counting System »

Safe Evacuation Procedure in Electrical Emergency Situation

This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital that the work should be planned in detail and risk assessments/ JSEA’s made… Read More: Safe Evacuation Procedure in Electrical Emergency Situation »

Surge & Lightning Protection Earthing Grounding System Installation

The aim of this method statement is to describe electrical works associated with installation of earthing / grounding system, lightning surge protection systems. The grounding & lightning protection system are designed to ensure the complete safety of both persons and equipment throughout the project buildings and facilities. Storage of exothermic welding materials should be in… Read More: Surge & Lightning Protection Earthing Grounding System Installation »

Method Statement for Cable Laying and Termination for Control and Signal Cables

The purpose of this method statement is to provide general guidelines for cable laying and cable termination for control and signal cables. Scope of this method statement covers the followings activities. material handling procedure precaution testing inspection The following documents are considered as reference documents: project standard installation drawings project specifications project quality plan (pqp)… Read More: Method Statement for Cable Laying and Termination for Control and… »