2020
Jun
30

Risk Management Process and Plan for Construction Project – HSE

Below is a steps wise risk management process that consists of hazard identification, risk assessment, risk control, analysis and improvement. The overall responsibility for the implementation of this procedure is with the project manager and safety and other department heads. Below are

2020
Jun
20

Sample Quality Policy and KPI Key Performance Indicators

Quality Policy Statement We will provide our customers with the highest quality of products and services to meet their requirements and maintain our position as a leading company in the field of construction. Through our commitment and compliance with the requirements of

2020
Jun
15

Task Specific Safe Work Method Statement Template

Type of Task:_____________________________________________ Date: Prepared By: Position: Company: Description of works: Location of activity: Approximate duration of the activity:     Commencement: Risk Assessment Ref: Operations Controls Covered                              

2020
Jun
5

Project Safety Training Awareness and Competence Requirements

Project safety training is mandatory for all project personnel. Safety training program is completed on the projects in accordance with the requirements of documented training procedure of an organization. Here we are identifying some necessary requirements. The Management of Health and Safety

2020
Jun
3

Honeycombing, Shrinkage Cracks, Tie-Rod Holes and Blowholes Concrete Repairing Method Statement

honeycomb in concrete repair

The purpose of this method statement is to define the procedure for the sequence of repairing of concrete defects, considering all safety and quality requirements. This procedure is written in order to present the method to be used for repairing concrete defects

error: Content is protected !!