2020
May
26

Method Statement for Cable Laying and Termination for Control and Signal Cables

The purpose of this method statement is to provide general guidelines for cable laying and cable termination for control and signal cables. Scope of this method statement covers the followings activities. material handling procedure precaution testing inspection The following documents are considered

2020
May
20

Document Controller Job Description, Skills and Required Experience – Technical Department

Job description: Document Controller-Technical/ Design Department MANAGEMENT SYSTEM RESPONSIBILITIES Raise suggestion as to improve the system of working. Follow the relevant procedure of the ISO or company’s QHSE procedure or the department’s Standard Operating Procedure (SOP) HANDLING OF CONTRACTS Receive all the

2020
May
19

Job Description of Technical Department Manager Civil Construction Company

Responsibilities of Technical Manager of Construction Company

Raise suggestion as to improve the system of working within the project and the company. Follow the relevant procedure of the ISO management systems. Raise NCR to the non-conforming procedures and practices in the department. Receive all the contract documents i.e. Contract

2020
May
18

Tower Crane Construction / Crane Erection Method Statement

The purpose of this project civil method statement is to define the procedure for the erection of tower crane. All work will be done in accordance with the requirements specified in the relevant specifications, technical procedures and approved drawings. This Method Statement

error: Content is protected !!