The purpose of this plumbing method statement is to define the task and introduce correct practices in order to ensure that the drainage piping job execution will meet the project requirements under the safe system of work. Procedure covers both metallic and
Read More
This procedure covers installation, pressure testing and functional commissioning of firefighting sprinkler system. Method statement covers an integrated system of underground and overhead piping designed in accordance with fire protection engineering standards. This method covers portion of the sprinkler system above ground
Read More
The purpose of this method statement is to define the procedure for the construction of manhole in accordance with the requirements specified in the relevant project specifications and drawings. This method statement should be implemented in conjunction with MEP method statement for
Read More
This method statement covers the installation of floor mounted Close Control Units CCU with down flow air delivery serving the room. Following this procedure will ensure the CCU installation has been carried out as per project/contract specifications and manufacturer’s recommendations. The mechanical
Read More
This method statement is applicable for Installation, testing & insulation of condensate drain piping and its accessories. The scope of work covers all areas where applicable inside the buildings from hvac equipment’s and in the roof areas as applicable. Drain piping installation
Read More
This method statement covers the procedure or sequence of installation of Ventilation & Exhaust Fans in different areas and for different types of fans. The procedure is applicable for any kind of HVAC project. Overall project manager and project mechanical engineer are
Read More
Table of Content 1. INTRODUCTION 2. PREREQUISITES TO PROCEDURE 2.1 Access / Egress 2.2 Responsibilities / Supervision 2.3 Requirements 2.4 Personal Protective Equipment 3. DESIGN PERAMETERS 3.1 Specification Reference 3.2 Drawing Reference 4. REFERENCE DOCUMENTS 4.1 Relevant Commissioning Codes 5. PRE-COMMISSIONING /
Read More
Below is a precise method statement for fan coil unit FCU installation for any kind of project. Project manager is overall responsible for the implementation of this method and all applicable standards, specifications and manufacturer instructions for the FCU installation. Site engineer/
Read More