This method of statement specifies the detailed requirements and procedures for the grease trap installation for the building or any kind of project. Strictly follow the manufacturers Health & Safety recommendations for handling and use of the grease trap units and accessory
Read More
This page provides detailed method statement for storm drainage water piping network installation including excavation, pipe laying, testing, backfilling, manhole construction and inspection procedures. The purpose of this method statement is to define the procedure for the preparation and construction of gravity
Read More
This method of statement specifies the sequences and methodology for the installation of MEP system for Water Treatment Plant. All workers associated with the installation of MEP for Water treatment plant will be responsible in accordance with the contract requirements and project
Read More
Below is a precise firefighting pump installation testing and commissioning method statement which is very useful as a guide for plumbing or firefighting engineers working on a construction project. Below is list of equipment and tools: Mechanical Tools Spanner Set Grooving /
Read More
The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements.
Read More
This method statement for fire fighting system covers below activities: Piping system installation Fire fighting equipment and accessories installation Installation of pumps Flushing/Cleaning of piping and equipment Installation of fire detection system and accessories Quality of installation and materials at site will
Read More
This procedure describes the minimum requirements that shall be observed at site for handling and storing materials, erection of hot dip galvanized primary and secondary steel structure to be installed. It also covers the tests and inspections that are to be carried
Read More
The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer sewage piping lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications considering
Read More