Tag Archives: method statement for storm drainage water piping network

Storm Drainage Water Piping Network Method Statement

This page provides detailed method statement for storm drainage water piping network installation including excavation, pipe laying, testing, backfilling, manhole construction and inspection procedures. The purpose of this method statement is to define the procedure for the preparation and construction of gravity line storm water in accordance with the requirements specified in the relevant specifications,… Read More: Storm Drainage Water Piping Network Method Statement »