2021
Nov
28

Method Statement for Water Supply PPR & Pex Piping Installation

This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor

2021
Nov
11

Roof Water Proofing Procedure Using Waterproof Membranes

Roof Water Proofing Procedure Using Waterproof Membranes

The scope of this procedure comprises the control of waterproof membranes installation and application on flat and inclined substrates. The condition and moisture content of the substrate will be inspected and accepted by the subcontractor before commencement of waterproofing works on site.

2021
Oct
29

Project Environmental Safety Procedure – Job Safety and Environmental Analysis

Project Environmental Safety Procedure - Job Safety and Environmental Analysis

The purpose of this EHS procedure is to provide a framework for reducing risks to employees and protect them from the work place hazards through the implementation of Job Safety and Environmental Analysis. Scope of work for this hse procedure  covers all

2021
Oct
19

Street Light Pole Foundation Construction Method Statement

Street Light Pole Foundation Construction Method Statement

The purpose of this method statement is to describe the procedure and activities involved in the construction of Street light pole foundations in the project complying all contract requirements. All quality control procedures to be implemented in systematic way, works shall be

2021
Oct
5

Control Panel and Electrical Junction Box Installation Electrical Work Method

Gl Conduits & Accessories Installation for Electrical and ELV Services

This document is intended for better understanding of the sequence of work activities to be done at site and does not replace the contractual specifications for installation of the junction box at the construction project. Ensure that all the PPE are available

2021
Sep
16

Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

This document summarizes the general details for any kind of scaffolding formwork system as well as traditional wooden forms including Fabrication, Erection, Removal, Inspection and Striking etc. The sequence of activities includes: Tying up reinforcement Concreting Curing De-shuttering Cleaning Stacking This scope