Author Archives: admin

Control Panel and Electrical Junction Box Installation Electrical Work Method

This document is intended for better understanding of the sequence of work activities to be done at site and does not replace the contractual specifications for installation of the junction box at the construction project. Ensure that all the PPE are available with the crew involved in the job. All required equipment and tools should… Read More: Control Panel and Electrical Junction Box Installation Electrical Work Method »

Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement

This document summarizes the general details for any kind of scaffolding formwork system as well as traditional wooden forms including Fabrication, Erection, Removal, Inspection and Striking etc. The sequence of activities includes: Tying up reinforcement Concreting Curing De-shuttering Cleaning Stacking This scope of works is for the following reinforced concrete works: Horizontal Elements: slabs, beams,… Read More: Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement »

AC Air Duct Cleaning Procedure

The purpose of this air duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. Duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting network. The maintenance or project manager is the overall responsible person for the process implementation of… Read More: AC Air Duct Cleaning Procedure »