Author Archives: admin

Chilled Water Piping Installation Pressure Testing & Insulation Method Statement

This mechanical method statement covers the nature and type of work for the installation of chilled water CHW piping and Accessories in the project building and the frequency on which the inspections are to be carried out. The method also covers the installation and inspection of Chilled Water Piping including Accessories. All the materials delivered… Read More: Chilled Water Piping Installation Pressure Testing & Insulation Method Statement »

Aggregate Shape Test to find Flakiness Index Elongation Index and Angularity Number

The purpose of this document is to describe the method for determining Flakiness Index, Elongation Index and Angularity Number of the given sample of aggregate. The particle shape of aggregate is determined by percentages of flaky and elongated particles contained in it. In case of gravel it is determined by its angularity number. For base… Read More: Aggregate Shape Test to find Flakiness Index Elongation Index and… »

Batching Plant Best Practices for Batching of Concrete

The scope of this procedure covers best practices and checks for carrying out prior to and during the site batching of concrete. Checks prior to commencement of concrete batching activity: Basic constituents of concrete viz. cement, coarse and fine aggregates shall comply with the contract specifications. In case of large projects and where specified, a… Read More: Batching Plant Best Practices for Batching of Concrete »

Civil Method Statement for AAC Block Masonry Works

The purpose of this method of statement is to provide general instructions for AAC Block masonry works at a construction project site. This work procedure covers AAC masonry work to be executed in the substructures/super structures of different buildings as specified in the approved drawings. AAC Concrete blocks (light weight) shall generally conform to local… Read More: Civil Method Statement for AAC Block Masonry Works »

Heavy Duty Tyre Mounting Method

Below is a brief instruction that is applicable to all project sites where heavy-duty tyres are in use. Repairing and replacing heavy-duty wheel assemblies presents a safety hazard because of the size and varying types of rubber tyred equipment. This Instruction outlines the safe methods to be followed in mounting heavy-duty tyres and rims. Project… Read More: Heavy Duty Tyre Mounting Method »

Diesel Generator Installation Method Statement

Below is a precise electrical method statement that describes the procedure for diesel generator installation on a project. The work methods are summarized as follows: Preparation of the Works Delivery and inspection of Generator upon delivery at site Setting out of works Installation of Diesel Generator Inspection of Generator Set Below is list of tools… Read More: Diesel Generator Installation Method Statement »

Method Statement for Water Supply PPR & Pex Piping Installation

This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been… Read More: Method Statement for Water Supply PPR & Pex Piping Installation »

Roof Water Proofing Procedure Using Waterproof Membranes

The scope of this procedure comprises the control of waterproof membranes installation and application on flat and inclined substrates. The condition and moisture content of the substrate will be inspected and accepted by the subcontractor before commencement of waterproofing works on site. A meeting will be held with specialist subcontractor to discuss the scope, sequence… Read More: Roof Water Proofing Procedure Using Waterproof Membranes »