Author Archives: admin

Submersible Sump Pump Installation Method Statement

This MEP works method statement covers the installation of the submersible sump pumps. Procedure defines the method used to ensure that the installation has been carried out as per contract specifications and manufacturer’s recommendations. It gives details of how the work will be carried out and the what health and safety issues and controls are… Read More: Submersible Sump Pump Installation Method Statement »

Construction Project Site Clearance Method

The purpose of this method is to give guidance for the clearing operation for all site areas where clearing is required. Instruction applies to all areas and is not limited to clearing for dump areas, haul roads and pits. This safework instruction takes into account all aspects of this activity including operation, production, safety, environment… Read More: Construction Project Site Clearance Method »

Method Statement for Skim Coat Works

The main purpose of this method statement is to outline the preparation and skim coating work with all the required specifications, standards, and application construction procedures. The procedure will ensure the desired finish as per the project specifications, i.e. steel trowel smooth to egg shell finish, without any powderiness, no trowel marks & physical undulating… Read More: Method Statement for Skim Coat Works »

Grouting Works Method Statement

This method statement describes the procedure and inspection instructions to be followed during the application of grouting works. Method will ensure that all activities are in fully compliance with specification requirements and as per manufacturer’s standards. All necessary precautions must be taken for working at height, while using the scaffoldings, ladders and handrails etc. Workers… Read More: Grouting Works Method Statement »

Demolition Method Statement for Covered Walkway

Below is a brief method statement that is for the demolition of existing covered walkway. Existing structure shall be removed completely, which is a cantilevered structure supported by steel elements and covered with roof tiles. Below is list of equipment for demolition works: Skip Tank Oxygen Acetylene cutting torch Electric Concrete breaker Mini- excavator Preparatory… Read More: Demolition Method Statement for Covered Walkway »

Chilled Water Piping Installation Pressure Testing & Insulation Method Statement

This mechanical method statement covers the nature and type of work for the installation of chilled water CHW piping and Accessories in the project building and the frequency on which the inspections are to be carried out. The method also covers the installation and inspection of Chilled Water Piping including Accessories. All the materials delivered… Read More: Chilled Water Piping Installation Pressure Testing & Insulation Method Statement »

Aggregate Shape Test to find Flakiness Index Elongation Index and Angularity Number

The purpose of this document is to describe the method for determining Flakiness Index, Elongation Index and Angularity Number of the given sample of aggregate. The particle shape of aggregate is determined by percentages of flaky and elongated particles contained in it. In case of gravel it is determined by its angularity number. For base… Read More: Aggregate Shape Test to find Flakiness Index Elongation Index and… »

Batching Plant Best Practices for Batching of Concrete

The scope of this procedure covers best practices and checks for carrying out prior to and during the site batching of concrete. Checks prior to commencement of concrete batching activity: Basic constituents of concrete viz. cement, coarse and fine aggregates shall comply with the contract specifications. In case of large projects and where specified, a… Read More: Batching Plant Best Practices for Batching of Concrete »