2022
Mar
3

Demolition Method Statement for Covered Walkway

Demolition Safework Method Statement

Below is a brief method statement that is for the demolition of existing covered walkway. Existing structure shall be removed completely, which is a cantilevered structure supported by steel elements and covered with roof tiles. Below is list of equipment for demolition

error: Content is protected !!