This tank fabrication method statement or procedure shall supplement the requirements of API 650 10th edition for construction, shop fabrications, field fabrications, welding and erection of oil storage tank for a project. In general all recommendations and suggestions advised in HSE Plan.
Read More
This concrete repairing method statement details the procedure for repairing the concrete works according to type of defects observed, in accordance with the manufacturer’s requirements. The works shall be performed as mentioned in this procedure and the quality assurance requirements shall be
Read More
This civil construction method statement provides the control sequence in construction and methodology procedure which details the post tension activities of the post tensioned slab as per approved shop drawings. Following materials and tools to be provided for performing the post tension
Read More
This as built procedure describes the requirements for preparation of as built drawing and other project as build documentation. The purpose of this procedure is to ensure that variations from the original dimensions, design intent or materials shown on the drawings, specifications,
Read More
ACTION VERIFY 1.0 Scope This procedure provides a standardized framework for the control of excavation, earthwork and filling to ensure compliance with conditions of contract and contract specifications. 2.0 Procedure All excavation, earthwork and filling will be carried out in Project Director/
Read More
This procedure describes the requirements on the notification, classification and reporting of all HSE accidents and incidents in order to ensure that notification and reporting of all accidents, incidents, diseases and dangerous occurrences is conducted in accordance with the requirement of the
Read More
This civil works method statement details general procedures for concrete works at any kind of project. This method statement for concrete works applies to all concrete work of permanent structure except lean concrete to be used as a structural fill and backfill.
Read More
This Method Statement details general procedure for slab deflection testing on any kind of project or building. Project Manager has the overall responsibility for the implementation of this method statement and shall well ensure that the Independent Testing Agency and as well
Read More