Emergency Lighting Central Battery System Installation Method Statement

The below electrical installation method statement describes standard operating steps to install the emergency lighting system or central battery system. This method is applicable for any kind of project, you can modify the method statement as per different project requirements. We have given this as a general guide and manufacturer instruction and site specific specification… Read More: Emergency Lighting Central Battery System Installation Method Statement »

Plastering Method Statement

This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project specifications. Project site manager will provide inputs as per the project execution plan to ensure that lifting strategies & philosophy are addressed, and is responsible for the overall management of the project construction team to ensure… Read More: Plastering Method Statement »

Method Statement for Installation Testing and Commissioning of 48V Battery Charger & Battery Bank

The purpose of this method statement is to define the sequence and working methodology of the positioning, installation, testing, commissioning and startup of DC system & Battery bank at a project. Prior to commencement of work, all shop drawings will be processed and submitted for approval by consultant/client. Shop drawings will show the layout of… Read More: Method Statement for Installation Testing and Commissioning of 48V Battery… »

Natural Gas Piping Installation Method Statement

This procedure is applicable to all natural gas pipeline underground installation works at any kind of project and aims to ensure that all works are carried out to comply with the applicable acts, regulations and by laws i.e. Local and international code of Practice for the Installation of Fuel Gas Piping Systems and Appliances, Occupational… Read More: Natural Gas Piping Installation Method Statement »

Sewer System Sewerage Piping Installation & Testing Method Statement

All the piping materials received at site will be inspected, upon receipt on the project site. Any discrepancies / damages should be notified and reported to the supplier for further action. Materials found not suitable for site use will be removed from site immediately. All construction/inspection/testing works shall be carried out in accordance with project… Read More: Sewer System Sewerage Piping Installation & Testing Method Statement »

Shear Wall Formwork Construction Method Statement

Below is a precise method statement that covers the formwork procedure for construction of shear walls. Kicker Form Assembly Procedure Upon completion of concreting of floor slab, all wall positions will be marked. Kicker forms are set according to the marked position of the wall. Kicker forms shall be secured to the floor slab properly.… Read More: Shear Wall Formwork Construction Method Statement »

Dewatering Method Statement

Below is a complete and precise dewatering method statement that covers the installation of the dewatering system as designed and detailed by temporary works designer/ consultant. Full time supervision shall be required to ensure the works are carried out in accordance to specifications, quality and approved drawings. Pumping Duration: Pumps shall be kept running to… Read More: Dewatering Method Statement »

BMS Building Management System Installation Method Statement

This method statement covers the site works for the building management BMS system installation as per approved material submittal and site requirements for the projects. All documentary requirements for this installation work will be submitted for approval and this will include Manufacturers data, certificate of compliance, brand designation, type and class including samples. QA/QC team… Read More: BMS Building Management System Installation Method Statement »