Below we have listed 19 toolbox talk topics with briefing which should take place during the daily safety meeting. Below is table of content which is covered in this post about the safety meeting topics. Sun Safety Work at height Mobile scaffolds
Read More
This mechanical method statement section applies to the hydrostatic testing of new fabricated and installed stainless steel SS pipelines associated with a construction or pipeline project. After completion and approval of all welding, radiography and NDT requirements/ activities the piping system shall
Read More
This specification document covers uninterruptible power supply UPS system Supply, installation, testing and commissioning of capacities as shown on the related drawings. The UPS system shall operate in conjunction with the building electrical system and the generator to provide high quality power
Read More
The below electrical installation method statement describes standard operating steps to install the emergency lighting system or central battery system. This method is applicable for any kind of project, you can modify the method statement as per different project requirements. We have
Read More
This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project specifications. Project site manager will provide inputs as per the project execution plan to ensure that lifting strategies & philosophy are addressed, and
Read More
The purpose of this method statement is to define the sequence and working methodology of the positioning, installation, testing, commissioning and startup of DC system & Battery bank at a project. Prior to commencement of work, all shop drawings will be processed
Read More
This procedure is applicable to all natural gas pipeline underground installation works at any kind of project and aims to ensure that all works are carried out to comply with the applicable acts, regulations and by laws i.e. Local and international code
Read More
All the piping materials received at site will be inspected, upon receipt on the project site. Any discrepancies / damages should be notified and reported to the supplier for further action. Materials found not suitable for site use will be removed from
Read More