Fabrication and Erection of Hot dip Galvanized Primary and Secondary Steel Structure

Steel Structure Building Construction Procedure

This procedure describes the minimum requirements that shall be observed at site for handling and storing materials, erection of hot dip galvanized primary and secondary steel structure to be installed. It also covers the tests and inspections that are to be carried

2025
Jun
21

Method Statement for Drainage Sewage Piping Works

Method Statement for Drainage Sewage Piping Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer sewage piping lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications considering

2025
Feb
28

Air Cooled Condenser Erection and Assembly Method Statement

Assembly of CCM, Bundles, SM, Piping Works and Wind wall

This document describes the methods proposed to be used for the erection operations related to the air cooled condenser for any kind of plant project. Method statement identifies the general steps, arrangements and precautions for the assembly and erection works of ACC.

2025
Jan
20

Chemical Flushing for Chilled Water System

Chemical Flushing for Chilled Water System

Below is a detailed chilled water pipe flushing procedure that covers cleaning, flushing and chemical treatment requirements for an existing or new project. Flushing of chilled water system shall be done as per the guidelines and requirements mentioned in the project specifications

2024
Jul
1

Method Statement for Stormwater Drainage

Below is precise method statement for drainage works covering sanitary, vent and stormwater pipes. Stormwater drainage is an important system for any kind of construction project. This plumbing method statement covers the installation of sanitary, vent and stormwater drainage piping system. The

2024
Jun
19

Copper Pipe Installation Method of Statement for Water Supply

Below plumbing method statement describes the procedure for the installation of copper pipe for domestic water services (hot & cold) inside buildings for any kind of the building construction project. Overall project manager is responsible for the implementation of this copper pipe installation