2022
May
25

Construction Project Site Clearance Method

Construction Project Site Clearance Method

The purpose of this method is to give guidance for the clearing operation for all site areas where clearing is required. Instruction applies to all areas and is not limited to clearing for dump areas, haul roads and pits. This safework instruction

2022
Mar
3

Demolition Method Statement for Covered Walkway

Demolition Safework Method Statement

Below is a brief method statement that is for the demolition of existing covered walkway. Existing structure shall be removed completely, which is a cantilevered structure supported by steel elements and covered with roof tiles. Below is list of equipment for demolition

2021
Dec
15

Heavy Duty Tyre Mounting Method

Below is a brief instruction that is applicable to all project sites where heavy-duty tyres are in use. Repairing and replacing heavy-duty wheel assemblies presents a safety hazard because of the size and varying types of rubber tyred equipment. This Instruction outlines

2021
Oct
29

Project Environmental Safety Procedure – Job Safety and Environmental Analysis

Project Environmental Safety Procedure - Job Safety and Environmental Analysis

The purpose of this EHS procedure is to provide a framework for reducing risks to employees and protect them from the work place hazards through the implementation of Job Safety and Environmental Analysis. Scope of work for this hse procedure  covers all

2021
Jun
26

Hot Work Permit System HSE Management Procedure – PTW Permit To Work System

Hot Work Permit System HSE Management Procedure - PTW Permit To Work System

This standard document describes the permit to work system to control potentially high risk hot work operations through the issue of a Hot Work Permit. By implementing this safe work instruction organization shall ensure a safe place to work when undertaking hot

error: Content is protected !!