Category Archives: Construction Method Statement

Gypsum Board Ceiling Method Statement

This method statement describes the method of installation of suspended gypsum board ceiling and tile ceiling in any kind of project or building. Project manager of the false ceiling subcontractor is overall responsible for the implementation of this method statement and ensure that the supervisory staff allocated for this work and all resources are in… Read More: Gypsum Board Ceiling Method Statement »

Method Statement for Manhole Construction

The purpose of this method statement is to define the procedure for the construction of manhole in accordance with the requirements specified in the relevant project specifications and drawings. This method statement should be implemented in conjunction with MEP method statement for pipe laying. All the procedures shall comply with the requirements of the municipality… Read More: Method Statement for Manhole Construction »

Condensate Drain Piping Installation and Testing Method Statement

This method statement is applicable for Installation, testing  & insulation of condensate drain piping and its accessories. The scope of work covers all areas where applicable inside the buildings from hvac equipment’s and in the roof areas as applicable. Drain piping installation shall be done as per the latest approved shop drawings for the required… Read More: Condensate Drain Piping Installation and Testing Method Statement »

Method Statement for 1” Fire Hose Reel System and 1 ½” Fire Hose System Installation

This method statement covers installation and inspection of 1” Fire Hose Reel System and 1 ½” Fire Hose System which is part of overall firefighting system. Purpose of this method of statement is to define the method of installation and inspection of Fire Fighting Hose Reel System. Quality of installation and materials at site will… Read More: Method Statement for 1” Fire Hose Reel System and 1… »

Wave Propagation Pile Testing Types and Methods

In the 1950’s, E.A. Smith of  the Raymond Pile Driving Company studied wave propagation on slender rods, and developed a numerical analysis method to predict the capacity versus blow count relationship and investigate pile driving stresses. The model mathematically represents the hammer and all its accessories (ram, cap, cap block), as well as the pile,… Read More: Wave Propagation Pile Testing Types and Methods »

Plastering Method Statement

This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project specifications. Project site manager will provide inputs as per the project execution plan to ensure that lifting strategies & philosophy are addressed, and is responsible for the overall management of the project construction team to ensure… Read More: Plastering Method Statement »

Natural Gas Piping Installation Method Statement

This procedure is applicable to all natural gas pipeline underground installation works at any kind of project and aims to ensure that all works are carried out to comply with the applicable acts, regulations and by laws i.e. Local and international code of Practice for the Installation of Fuel Gas Piping Systems and Appliances, Occupational… Read More: Natural Gas Piping Installation Method Statement »

Sewer System Sewerage Piping Installation & Testing Method Statement

All the piping materials received at site will be inspected, upon receipt on the project site. Any discrepancies / damages should be notified and reported to the supplier for further action. Materials found not suitable for site use will be removed from site immediately. All construction/inspection/testing works shall be carried out in accordance with project… Read More: Sewer System Sewerage Piping Installation & Testing Method Statement »