Firefighting Pump Set Installation, Testing & Commissioning Method Statement

Firefighting Pump Set Installation, Testing & Commissioning Method Statement

Below is a precise firefighting pump installation testing and commissioning method statement which is very useful as a guide for plumbing or firefighting engineers working on a construction project. Below is list of equipment and tools: Mechanical Tools Spanner Set Grooving /

2021
Jul
3

Wall & Flooring Tiles Installation Method Statement

floor tiles installation work method statement

The purpose of this civil work method statement is to outline and describe in detail the procedure such as setting and lay-out plan on actual location, laying of tiles, mixing of mortar tile grout, final laying of tiles and all other related

2021
Jun
26

Hot Work Permit System HSE Management Procedure – PTW Permit To Work System

Hot Work Permit System HSE Management Procedure - PTW Permit To Work System

This standard document describes the permit to work system to control potentially high risk hot work operations through the issue of a Hot Work Permit. By implementing this safe work instruction organization shall ensure a safe place to work when undertaking hot

2021
Jun
18

Sequences and Methodology for Installation of MEP System for Water Treatment Plant

Sequences and Methodology for Installation of MEP System for Water Treatment Plant

This method of statement specifies the sequences and methodology for the installation of MEP system for Water Treatment Plant. All workers associated with the installation of MEP for Water treatment plant will be responsible in accordance with the contract requirements and project

2021
Jun
7

Method Statement for PDA Testing On Bored Pile / Micro Pile

Below document describes instructions and guidelines for PDA Testing On Bored Piles / Micro Piles. The PDA/CAPWAP system was developed by Pile Dynamics Inc, Ohio, USA and has been in use for more than 15 years. PDA field data acquisition and computer

2021
May
18

Method Statement for Installation of Earthing & Lightning Protection System

This  electrical method  statement covers the nature and type of work for  the Earthing  & Lightning Protection System installation as per site requirements for the project. The piles and vertical re-bars are provided with connections for Earthing & Lightning Protection System installation

2021
Apr
29

Gl Conduits & Accessories Installation for Electrical and ELV Services

Gl Conduits & Accessories Installation for Electrical and ELV Services

This  electrical method statement covers the nature and type of work for the Gl Conduits & Accessories installation for the following systems as applicable on the projects. Lighting Control Small Power Data & Voice (telephones) Security Access Control Electrics to Mechanical Services