2020
Aug
29

As Built Drawing and Documentation Project Management Procedure

This as built procedure describes the requirements for preparation of as built drawing and other project as build documentation. The purpose of this procedure is to ensure that variations from the original dimensions, design intent or materials shown on the drawings, specifications,

2020
Aug
19

Construction Quality Control Procedure for Excavation Earth Work and Back Filling (Foundations)

ACTION VERIFY  1.0     Scope This procedure provides a standardized framework for the control of excavation, earthwork and filling to ensure compliance with conditions of contract and contract specifications. 2.0     Procedure All excavation, earthwork and filling will be carried out in Project Director/

2020
Aug
16

Occupational Health and Safety HSE Accidents and Incidents Reporting and Investigation Procedure

This procedure describes the requirements on the notification, classification and reporting of all HSE accidents and incidents in order to ensure that notification and reporting of all accidents, incidents, diseases and dangerous occurrences is conducted in accordance with the requirement of the

2020
Jul
20

Concrete Works Method Statement for Construction Project

method statement for concrete works

This civil works method statement details general procedures for concrete works at any kind of project. This method statement for concrete works applies to all concrete work of permanent structure except lean concrete to be used as a structural fill and backfill.

2020
Jun
30

Risk Management Process and Plan for Construction Project – HSE

Below is a steps wise risk management process that consists of hazard identification, risk assessment, risk control, analysis and improvement. The overall responsibility for the implementation of this procedure is with the project manager and safety and other department heads. Below are

2020
Jun
20

Sample Quality Policy and KPI Key Performance Indicators

Quality Policy Statement We will provide our customers with the highest quality of products and services to meet their requirements and maintain our position as a leading company in the field of construction. Through our commitment and compliance with the requirements of

2020
Jun
15

Task Specific Safe Work Method Statement Template

Type of Task:_____________________________________________ Date: Prepared By: Position: Company: Description of works: Location of activity: Approximate duration of the activity:     Commencement: Risk Assessment Ref: Operations Controls Covered                              

error: Content is protected !!