Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement

This document summarizes the general details for any kind of scaffolding formwork system as well as traditional wooden forms including Fabrication, Erection, Removal, Inspection and Striking etc. The sequence of activities includes: Tying up reinforcement Concreting Curing De-shuttering Cleaning Stacking This scope of works is for the following reinforced concrete works: Horizontal Elements: slabs, beams,… Read More »

AC Air Duct Cleaning Procedure

The purpose of this air duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. Duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting network. The maintenance or project manager is the overall responsible person for the process implementation of… Read More »

Grease Trap Installation Procedure

This method of statement specifies the detailed requirements and procedures for the grease trap installation for the building or any kind of project. Strictly follow the manufacturers Health & Safety recommendations for handling and use of the grease trap units and accessory materials. Site team shall ensure that all the operatives are aware of the… Read More »

Storm Drainage Water Piping Network Method Statement

TABLE OF CONTENTS 1. REVISION RECORD 2. PURPOSE 3. SCOPE OF WORKS 4. REFERENCES 4.1. Contract documents 4.2. Contractors Submittal 5. DEFINITIONS / ABBREVIATIONS 5.1. Definition 5.2. Abbreviations 6. RESPONSIBILITIES 6.1. Project Manager 6.2. Site Engineer 6.3. Project Engineer 6.4. QA/QC Engineer / Inspector 6.5. Surveyor 6.6. HSE Engineer/Officer 6.7. Foremen/ Works Supervisor 7. EQUIPMENTS/… Read More »

HDPE Piping System Underground Construction Method

The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements. Scope of work for this method statement includes handling, storage, delivery, installation instructions… Read More »

Firefighting Pump Set Installation, Testing & Commissioning Method Statement

Below is a precise firefighting pump installation testing and commissioning method statement which is very useful as a guide for plumbing or firefighting engineers working on a construction project. Below is list of equipment and tools: Mechanical Tools Spanner Set Grooving / Threading Machine Valve opening keys Test gauges Tachometer Multi Meter Dial gauge Pressure… Read More »

Wall & Flooring Tiles Installation Method Statement

The purpose of this civil work method statement is to outline and describe in detail the procedure such as setting and lay-out plan on actual location, laying of tiles, mixing of mortar tile grout, final laying of tiles and all other related activity. This flooring tiles activity should be performed with strict compliance and implementation… Read More »

Hot Work Permit System HSE Management Procedure – PTW Permit To Work System

This standard document describes the permit to work system to control potentially high risk hot work operations through the issue of a Hot Work Permit. By implementing this safe work instruction organization shall ensure a safe place to work when undertaking hot works on any type and size of project. Additional control measures may be… Read More »