This mechanical method statement covers the nature and type of work for the installation of chilled water CHW piping and Accessories in the project building and the frequency on which the inspections are to be carried out. The method also covers the
Read More
The purpose of this document is to describe the method for determining Flakiness Index, Elongation Index and Angularity Number of the given sample of aggregate. The particle shape of aggregate is determined by percentages of flaky and elongated particles contained in it.
Read More
The scope of this procedure covers best practices and checks for carrying out prior to and during the site batching of concrete. Checks prior to commencement of concrete batching activity: Basic constituents of concrete viz. cement, coarse and fine aggregates shall comply
Read More
The purpose of this method of statement is to provide general instructions for AAC Block masonry works at a construction project site. This work procedure covers AAC masonry work to be executed in the substructures/super structures of different buildings as specified in
Read More
Below is a brief instruction that is applicable to all project sites where heavy-duty tyres are in use. Repairing and replacing heavy-duty wheel assemblies presents a safety hazard because of the size and varying types of rubber tyred equipment. This Instruction outlines
Read More
Below is a precise electrical method statement that describes the procedure for diesel generator installation on a project. The work methods are summarized as follows: Preparation of the Works Delivery and inspection of Generator upon delivery at site Setting out of works
Read More
This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor
Read More
The scope of this procedure comprises the control of waterproof membranes installation and application on flat and inclined substrates. The condition and moisture content of the substrate will be inspected and accepted by the subcontractor before commencement of waterproofing works on site.
Read More