Category Archives: Mechanical Method Statement

Submersible Sump Pump Installation Method Statement

This MEP works method statement covers the installation of the submersible sump pumps. Procedure defines the method used to ensure that the installation has been carried out as per contract specifications and manufacturer’s recommendations. It gives details of how the work will be carried out and the what health and safety issues and controls are… Read More »

Chilled Water Piping Installation Pressure Testing & Insulation Method Statement

This mechanical method statement covers the nature and type of work for the installation of chilled water CHW piping and Accessories in the project building and the frequency on which the inspections are to be carried out. The method also covers the installation and inspection of Chilled Water Piping including Accessories. All the materials delivered… Read More »

Method Statement for Water Supply PPR & Pex Piping Installation

This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been… Read More »

AC Air Duct Cleaning Procedure

The purpose of this air duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. Duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting network. The maintenance or project manager is the overall responsible person for the process implementation of… Read More »

Grease Trap Installation Procedure

This method of statement specifies the detailed requirements and procedures for the grease trap installation for the building or any kind of project. Strictly follow the manufacturers Health & Safety recommendations for handling and use of the grease trap units and accessory materials. Site team shall ensure that all the operatives are aware of the… Read More »

Storm Drainage Water Piping Network Method Statement

TABLE OF CONTENTS 1. REVISION RECORD 2. PURPOSE 3. SCOPE OF WORKS 4. REFERENCES 4.1. Contract documents 4.2. Contractors Submittal 5. DEFINITIONS / ABBREVIATIONS 5.1. Definition 5.2. Abbreviations 6. RESPONSIBILITIES 6.1. Project Manager 6.2. Site Engineer 6.3. Project Engineer 6.4. QA/QC Engineer / Inspector 6.5. Surveyor 6.6. HSE Engineer/Officer 6.7. Foremen/ Works Supervisor 7. EQUIPMENTS/… Read More »

HDPE Piping System Underground Construction Method

The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements. Scope of work for this method statement includes handling, storage, delivery, installation instructions… Read More »

Firefighting Pump Set Installation, Testing & Commissioning Method Statement

Below is a precise firefighting pump installation testing and commissioning method statement which is very useful as a guide for plumbing or firefighting engineers working on a construction project. Below is list of equipment and tools: Mechanical Tools Spanner Set Grooving / Threading Machine Valve opening keys Test gauges Tachometer Multi Meter Dial gauge Pressure… Read More »