Purpose of this mechanical procedure is to define the sequence and methodology for all critical installation activity pertaining to HVAC air distribution system i.e. ductworks for any kind of construction project building with contract scope of work, applicable standards and drawings. The
Read More
Below is a brief HVAC method statement that covers the installation of Air Handling Units on a construction project. Procedure defines the method used to ensure the AHU installation has been carried out as per contract specifications and manufacturer’s recommendations. Method statement
Read More
All welding shall be generally in accordance with BS 4515 (Specification for field welding of Carbon steel pipelines.). The method may be modified where appropriate for other materials and may be relaxed or varied by order of the consulting engineer, provided that
Read More
Below is precise plumbing method statement that shall ensure that the plumbing accessories i.e. valves installation is done as per contract requirements and manufacturer instructions. The method also gives details of how the work will be carried out and the health and
Read More
This plumbing method statement covers the installation of strainers. Procedure defines the method used to ensure the installation has been carried out as per contract requirements and best industry practices. It gives details of how the work will be carried out and
Read More
This MEP works method statement covers the installation of the submersible sump pumps. Procedure defines the method used to ensure that the installation has been carried out as per contract specifications and manufacturer’s recommendations. It gives details of how the work will
Read More
This mechanical method statement covers the nature and type of work for the installation of chilled water CHW piping and Accessories in the project building and the frequency on which the inspections are to be carried out. The method also covers the
Read More
This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor
Read More