2024
Jun
6

MCC, ACB and Control Panels Installation Method Statement

MCC, ACB and Control Panels Installation Method Statement

This document describes the methodology for installation of MCC, ACB and control panels in any kind of the project, also to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources. By following this electrical method statement

2024
Apr
20

Electrical Method Statement for Conduits and Boxes Installation PVC GI RGS EMT

Electrical Method Statement for Conduits and Boxes Installation PVC GI RGS EMT

Below is a precise electrical method statement that covers all processes related to the installation of PVC, GI, RGS, EMT and steel conduits and boxes as per project specification, manufacturer recommendation, approved drawings, civil defense approval and any other applicable regulations. The

2024
Feb
10

Electrical Panel Installation for LV Switchgear and Load Center

This method statement covers the electrical installation of LV switchgear and load center. Installation shall be in compliance with project electrical specifications, manufacturer instructions, applicable codes and international standards. Packaging, identification, delivery and storage shall be as per supplier recommendations and approved

2023
Jul
3

UPS Installation Procedure Specification Requirements

This specification document covers uninterruptible power supply UPS system Supply, installation, testing and commissioning of capacities as shown on the related drawings. The UPS system shall operate in conjunction with the building electrical system and the generator to provide high quality power

2023
Jun
28

Emergency Lighting Central Battery System Installation Method Statement

The below electrical installation method statement describes standard operating steps to install the emergency lighting system or central battery system. This method is applicable for any kind of project, you can modify the method statement as per different project requirements. We have

2023
Apr
29

Method Statement for Installation Testing and Commissioning of 48V Battery Charger & Battery Bank

The purpose of this method statement is to define the sequence and working methodology of the positioning, installation, testing, commissioning and startup of DC system & Battery bank at a project. Prior to commencement of work, all shop drawings will be processed

error: Content is protected !!