Category Archives: Construction Method Statement

Parapet Wall / Parapet Roof Construction Method Statement

This parapet method statement will help to describe the procedure to for parapet wall and parapet roof construction works, that ultimately will ensure that the work is planned and performed in accordance with project technical specifications and drawings. The project manager will be responsible for overall parapet wall construction activities. Parapet work will be carried… Read More: Parapet Wall / Parapet Roof Construction Method Statement »

Sheet Pile Installation Method Statement

Below is the best sheet pile method statement that describes the method and procedures involved in the installation of sheet pile wall (as per approved drawings) as temporary shoring and facilitate the work relating to the construction works. The technical specification and other relevant information on machinery and equipment used in sheet piling installation works… Read More: Sheet Pile Installation Method Statement »

Oil Storage Tank Fabrication Welding and Erection Method Statement

This tank fabrication method statement or procedure shall supplement the requirements of API 650 10th edition for construction, shop fabrications, field fabrications, welding and erection of oil storage tank for a project. In general all recommendations and suggestions advised in HSE Plan. shall be strictly adhered by all Personnel working at field and fabrication yard… Read More: Oil Storage Tank Fabrication Welding and Erection Method Statement »

Method Statement for Repair of Concrete with Fosrocs Rendroc Materials

This concrete repairing method statement details the procedure for repairing the concrete works according to type of defects observed, in accordance with the manufacturer’s requirements. The works shall be performed as mentioned in this procedure and the quality assurance requirements shall be consistent with the relevant sections of Quality Management System Manual of the contractor… Read More: Method Statement for Repair of Concrete with Fosrocs Rendroc Materials »

Post Tensioned Slab Method Statement Activities

This civil construction method statement provides the control sequence in construction and methodology procedure which details the post tension activities of the post tensioned slab as per approved shop drawings. Following materials and tools to be provided for performing the post tension slab activities: Strands Galvanized Flat Ducts Anchor Blocks Stressing Blocks Wedges Denzo tape… Read More: Post Tensioned Slab Method Statement Activities »

Concrete Works Method Statement for Construction Project

This civil works method statement details general procedures for concrete works at any kind of project. This method statement for concrete works applies to all concrete work of permanent structure except lean concrete to be used as a structural fill and backfill. The normal sequence of concrete works is: Curing Bituminous Protective Painting Back Filling… Read More: Concrete Works Method Statement for Construction Project »

Tower Crane Construction / Crane Erection Method Statement

The purpose of this project civil method statement is to define the procedure for the erection of tower crane. All work will be done in accordance with the requirements specified in the relevant specifications, technical procedures and approved drawings. This Method Statement applies to the supply and delivery of tower crane components, the movements of… Read More: Tower Crane Construction / Crane Erection Method Statement »

Fabrication and Erection of Hot dip Galvanized Primary and Secondary Steel Structure

This procedure describes the minimum requirements that shall be observed at site for handling and storing materials, erection of hot dip galvanized primary and secondary steel structure to be installed. It also covers the tests and inspections that are to be carried out during the execution of the fabrication, erection and assembly works. This procedure… Read More: Fabrication and Erection of Hot dip Galvanized Primary and Secondary… »