Category Archives: Construction Method Statement

Micropile Installation Method Statement

Below is a precise method statement for micropile construction using the latest technology. Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which has a higher strength and/or workability shall also be allowed depending upon the consultant approval. Grout Mix The proportions of grout and… Read More: Micropile Installation Method Statement »

Waterproofing Method Statement for Pile Head Blinding Walls & Water Tank

The purpose of this civil work method statement is to define the procedure of the waterproofing works for underground water tanks and basement in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. Scope of this method statement is for the water proofing works… Read More: Waterproofing Method Statement for Pile Head Blinding Walls & Water… »

Decorative Plaster Method Statement

The purpose of this method statement is to ensure that decorative plaster work and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. Project Manager shall be responsible for… Read More: Decorative Plaster Method Statement »

Method Statement for Drainage Sewage Piping Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer sewage piping lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications considering safety and quality of the work activities. Scope of work is as below:… Read More: Method Statement for Drainage Sewage Piping Works »

Method statement for Receiving and Incoming Material Inspection On Construction Project Site

Below is a method statement which is helpful for defining the procedure for receiving and inspecting incoming materials on the project construction site including the concrete inspection. The purpose of this method statement is is to define the procedure for receiving and inspection of purchased materials to the site. The incoming material inspection method covers:… Read More: Method statement for Receiving and Incoming Material Inspection On Construction… »

Slab Deflection Test Method Statement Procedure

This Method Statement details general procedure for slab deflection testing on any kind of project or building. Project Manager has the overall responsibility for the implementation of this method statement and shall well ensure that the Independent Testing Agency and as well as other team members are aware of the requirements of the Method Statement.… Read More: Slab Deflection Test Method Statement Procedure »

Honeycombing, Shrinkage Cracks, Tie-Rod Holes and Blowholes Concrete Repairing Method Statement

The purpose of this honeycomb repair method statement is to define the procedure for the sequence of repairing of concrete defects, considering all safety and quality requirements. This procedure is written in order to present the method to be used for repairing concrete defects due to minor plastic and drying shrinkage cracks, formworks removal, honeycombs,… Read More: Honeycombing, Shrinkage Cracks, Tie-Rod Holes and Blowholes Concrete Repairing Method… »

Land Surveying Method Statement for Projects

The purpose of Survey work will include, but not be limited, to the following; Initial Surveys to confirm the site boundaries (plot boundaries); establish permanent marks and record site levels and details. Set out for control of formwork and all other structures. Lift core verticality As-built surveys. The scope of this method statement is for… Read More: Land Surveying Method Statement for Projects »