Author Archives: admin

Wall & Flooring Tiles Installation Method Statement

The purpose of this civil work method statement is to outline and describe in detail the procedure such as setting and lay-out plan on actual location, laying of tiles, mixing of mortar tile grout, final laying of tiles and all other related activity. This flooring tiles activity should be performed with strict compliance and implementation… Read More: Wall & Flooring Tiles Installation Method Statement »

Firefighting Pump Set Installation, Testing & Commissioning Method Statement

Below is a precise firefighting pump installation testing and commissioning method statement which is very useful as a guide for plumbing or firefighting engineers working on a construction project. Below is list of equipment and tools: Mechanical Tools Spanner Set Grooving / Threading Machine Valve opening keys Test gauges Tachometer Multi Meter Dial gauge Pressure… Read More: Firefighting Pump Set Installation, Testing & Commissioning Method Statement »

HDPE Piping System Underground Construction Method

The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements. Scope of work for this method statement includes handling, storage, delivery, installation instructions… Read More: HDPE Piping System Underground Construction Method »

External Stone Cladding Installation Method Statement for Marble and Granite

The Purpose of this procedure is to ensure that External Stone Cladding work (Marble and Granite) are executed in accordance with the contract requirements, hazards are analyzed, safety procedures implemented all quality assurance/control activities are conducted in a systematic manner, works inspected and conformance is verified and documented for the project. This method statement to… Read More: External Stone Cladding Installation Method Statement for Marble and Granite »

Dewatering Method Statement Cable Trench Dewatering Well Point System Method of Statement

Below is a precise dewatering method statement. Dewatering is the temporary reduction of pore pressures or groundwater levels to provide dry, stable and safe soil conditions in excavations below groundwater level. On a construction project dewatering is used to facilitate the construction of the deep excavations that are required for foundations, basements, trenches and other… Read More: Dewatering Method Statement Cable Trench Dewatering Well Point System Method… »

Method Statement for Firefighting Piping Equipment and Accessories Installation

This method statement for fire fighting system covers below activities: Piping system installation Fire fighting equipment and accessories installation Installation of pumps Flushing/Cleaning of piping and equipment Installation of fire detection system and accessories Quality of installation and materials at site will be ensured by project team consisting of a Project Manager, Project Engineers, QA… Read More: Method Statement for Firefighting Piping Equipment and Accessories Installation »

Gl Conduits & Accessories Installation for Electrical and ELV Services

On this page you shall find method statement for electrical conduit installation. This  electrical method statement covers the nature and type of work for the Gl conduits & accessories installation for the following systems as applicable on the projects. Lighting Control Small Power Data & Voice (telephones) Security Access Control Electrics to Mechanical Services BMS/Automatic… Read More: Gl Conduits & Accessories Installation for Electrical and ELV Services »

Trench Preparation Excavation and Backfill Method Statement for Electric Underground Cable Laying

The purpose of this document is to specify the procedure for excavation backfilling and trench preparation for installation of 132 kV cables and fiber optic Cables. Roles & Responsibilities Project Manager: Lead all construction activities and enforce strict adherence to all procedures. Site Manager: Lead the construction activities at site and report to the Project… Read More: Trench Preparation Excavation and Backfill Method Statement for Electric Underground… »