Author Archives: admin

Method Statement for Building Construction Site Leveling & Grading

Below is list of necessary tools and equipment for the site leveling and grading works. Hand Tools Hand Shovels Plastic Buckets Wheel Barrows Equipment’s Earth Moving Equipment’s: Grader, Excavator, Shovel etc. Tippers , Dump trucks Roller Compactor, Plate compactor Water tankers Pre Requirements Permit to Work (PTW) shall be raised for clearing, grading and levelling,… Read More: Method Statement for Building Construction Site Leveling & Grading »

Testing & Commissioning Method Statement for Footfall Visitor Counting System

The user acceptance tests will demonstrate that the system and related materials have been correctly installed and that the footfall system will operate in a manner that will enable client to accept it as a working system and proceed with the process of using it. Purpose of the User Acceptance Tests (UAT) in this document… Read More: Testing & Commissioning Method Statement for Footfall Visitor Counting System »

Safe Evacuation Procedure in Electrical Emergency Situation

This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital that the work should be planned in detail and risk assessments/ JSEA’s made… Read More: Safe Evacuation Procedure in Electrical Emergency Situation »

Surge & Lightning Protection Earthing Grounding System Installation

The aim of this method statement is to describe electrical works associated with installation of earthing / grounding system, lightning surge protection systems. The grounding & lightning protection system are designed to ensure the complete safety of both persons and equipment throughout the project buildings and facilities. Storage of exothermic welding materials should be in… Read More: Surge & Lightning Protection Earthing Grounding System Installation »

Parapet Wall / Parapet Roof Construction Method Statement

This parapet method statement will help to describe the procedure to for parapet wall and parapet roof construction works, that ultimately will ensure that the work is planned and performed in accordance with project technical specifications and drawings. The project manager will be responsible for overall parapet wall construction activities. Parapet work will be carried… Read More: Parapet Wall / Parapet Roof Construction Method Statement »

Boom Truck Operators Instructions on Construction Projects

Below standard work instruction addresses the training of new boom truck operators including the refresher awareness and training of experienced operator. This instruction applies to all operators of boom trucks on construction project sites. All Boom Truck operators must hold a valid license before operating the truck at project sites. Also as an additional safety… Read More: Boom Truck Operators Instructions on Construction Projects »

Sheet Pile Installation Method Statement

Below is the best sheet pile method statement that describes the method and procedures involved in the installation of sheet pile wall (as per approved drawings) as temporary shoring and facilitate the work relating to the construction works. The technical specification and other relevant information on machinery and equipment used in sheet piling installation works… Read More: Sheet Pile Installation Method Statement »

Oil Storage Tank Fabrication Welding and Erection Method Statement

This tank fabrication method statement or procedure shall supplement the requirements of API 650 10th edition for construction, shop fabrications, field fabrications, welding and erection of oil storage tank for a project. In general all recommendations and suggestions advised in HSE Plan. shall be strictly adhered by all Personnel working at field and fabrication yard… Read More: Oil Storage Tank Fabrication Welding and Erection Method Statement »