2021
Aug
23

Grease Trap Installation Procedure

Grease Trap Installation Procedure

This method of statement specifies the detailed requirements and procedures for the grease trap installation for the building or any kind of project. Strictly follow the manufacturers Health & Safety recommendations for handling and use of the grease trap units and accessory

2021
Aug
15

Storm Drainage Water Piping Network Method Statement

Storm Drainage Piping & Sanitary Vent Installation Method Statement

TABLE OF CONTENTS 1. REVISION RECORD 2. PURPOSE 3. SCOPE OF WORKS 4. REFERENCES 4.1. Contract documents 4.2. Contractors Submittal 5. DEFINITIONS / ABBREVIATIONS 5.1. Definition 5.2. Abbreviations 6. RESPONSIBILITIES 6.1. Project Manager 6.2. Site Engineer 6.3. Project Engineer 6.4. QA/QC Engineer

2021
Aug
3

HDPE Piping System Underground Construction Method

HDPE Piping System Underground Construction Method

The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements.

2021
Jul
26

Firefighting Pump Set Installation, Testing & Commissioning Method Statement

Firefighting Pump Set Installation, Testing & Commissioning Method Statement

Below is a precise firefighting pump installation testing and commissioning method statement which is very useful as a guide for plumbing or firefighting engineers working on a construction project. Below is list of equipment and tools: Mechanical Tools Spanner Set Grooving /

2021
Jul
3

Wall & Flooring Tiles Installation Method Statement

floor tiles installation work method statement

The purpose of this civil work method statement is to outline and describe in detail the procedure such as setting and lay-out plan on actual location, laying of tiles, mixing of mortar tile grout, final laying of tiles and all other related

2021
Jun
26

Hot Work Permit System HSE Management Procedure – PTW Permit To Work System

Hot Work Permit System HSE Management Procedure - PTW Permit To Work System

This standard document describes the permit to work system to control potentially high risk hot work operations through the issue of a Hot Work Permit. By implementing this safe work instruction organization shall ensure a safe place to work when undertaking hot

2021
Jun
18

Sequences and Methodology for Installation of MEP System for Water Treatment Plant

Sequences and Methodology for Installation of MEP System for Water Treatment Plant

This method of statement specifies the sequences and methodology for the installation of MEP system for Water Treatment Plant. All workers associated with the installation of MEP for Water treatment plant will be responsible in accordance with the contract requirements and project

2021
Jun
7

Method Statement for PDA Testing On Bored Pile / Micro Pile

Below document describes instructions and guidelines for PDA Testing On Bored Piles / Micro Piles. The PDA/CAPWAP system was developed by Pile Dynamics Inc, Ohio, USA and has been in use for more than 15 years. PDA field data acquisition and computer