2022
Jun
9

Submersible Sump Pump Installation Method Statement

sump pump submersible pump installation diagram

This MEP works method statement covers the installation of the submersible sump pumps. Procedure defines the method used to ensure that the installation has been carried out as per contract specifications and manufacturer’s recommendations. It gives details of how the work will

2022
May
25

Construction Project Site Clearance Method

Construction Project Site Clearance Method

The purpose of this method is to give guidance for the clearing operation for all site areas where clearing is required. Instruction applies to all areas and is not limited to clearing for dump areas, haul roads and pits. This safework instruction

2022
Mar
3

Demolition Method Statement for Covered Walkway

Demolition Safework Method Statement

Below is a brief method statement that is for the demolition of existing covered walkway. Existing structure shall be removed completely, which is a cantilevered structure supported by steel elements and covered with roof tiles. Below is list of equipment for demolition

2022
Feb
14

Chilled Water Piping Installation Pressure Testing & Insulation Method Statement

Method Statement For Installation, Pressure Testing & Insulation of Chilled Water Piping

This mechanical method statement covers the nature and type of work for the installation of chilled water CHW piping and Accessories in the project building and the frequency on which the inspections are to be carried out. The method also covers the

2022
Jan
25

Aggregate Shape Test to find Flakiness Index Elongation Index and Angularity Number

Aggregate Shape Test to find Flakiness Index Elongation Index and Angularity Number

The purpose of this document is to describe the method for determining Flakiness Index, Elongation Index and Angularity Number of the given sample of aggregate. The particle shape of aggregate is determined by percentages of flaky and elongated particles contained in it.

2022
Jan
4

Batching Plant Best Practices for Batching of Concrete

Batching Plant Best Practices for Batching of Concrete

The scope of this procedure covers best practices and checks for carrying out prior to and during the site batching of concrete. Checks prior to commencement of concrete batching activity: Basic constituents of concrete viz. cement, coarse and fine aggregates shall comply