Closed Control Unit CCU Air Conditioning Unit Installation Method Statement

This method statement covers the installation of floor mounted Close Control Units CCU with down flow air delivery serving the room. Following this procedure will ensure the CCU installation has been carried out as per project/contract specifications and manufacturer’s recommendations. The mechanical method statement gives details of how the work will be carried out and… Read More »

Condensate Drain Piping Installation and Testing Method Statement

This method statement is applicable for Installation, testing  & insulation of condensate drain piping and its accessories. The scope of work covers all areas where applicable inside the buildings from hvac equipment’s and in the roof areas as applicable. Drain piping installation shall be done as per the latest approved shop drawings for the required… Read More »

Electrical Panel Installation for LV Switchgear and Load Center

This method statement covers the electrical installation of LV switchgear and load center. Installation shall be in compliance with project electrical specifications, manufacturer instructions, applicable codes and international standards. Packaging, identification, delivery and storage shall be as per supplier recommendations and approved handling and storage procedures. Other reference documents include: Project Quality Plan Project HSE… Read More »

Method Statement for Installation and Testing of PA Public Address System

This method statement covers the Installation of Public Address System at any kind of building construction or renovation project. The public address system shall provide to public areas background music programs, live message and recorded or synthesized voice messages. PA system shall be fully programmable and shall be controlled and monitored on digital bases by… Read More »

Extractor Ventilation Exhaust Fan Installation Method Statement

This method statement covers the procedure or sequence of installation of Ventilation & Exhaust Fans in different areas and for different types of fans. The procedure is applicable for any kind of HVAC project. Overall project manager and project mechanical engineer are responsible for the implementation of this procedure. The exhaust fans installation shall be… Read More »

Method Statement for HVAC Air Balancing and Air Flow Measurement

Table of Content 1. INTRODUCTION 2. PREREQUISITES TO PROCEDURE 2.1 Access / Egress 2.2 Responsibilities / Supervision 2.3 Requirements 2.4 Personal Protective Equipment 3. DESIGN PERAMETERS 3.1 Specification Reference 3.2 Drawing Reference 4. REFERENCE DOCUMENTS 4.1 Relevant Commissioning Codes 5. PRE-COMMISSIONING / PRE START CHECKS 5.1 Static Checks 6. COMMISSIONING / TEST PROCEDURES 6.1 Starting… Read More »

Fan Coil FCU Unit Installation Method Statement

Below is a precise method statement for fan coil unit FCU installation for any kind of project. Project manager is overall responsible for the implementation of this method and all applicable standards, specifications and manufacturer instructions for the FCU installation. Site engineer/ supervisor shall make sure that all necessary documentation work is approved, shop drawings/… Read More »

Water Heater Installation | Geyser Installation Method Statement

This page gives a brief method statement for water heater installation or geyser installation in compliance with the approved design, drawings, approved material submittals and project specification. Prior to installation of Water Heater, the supervisor and foreman will verify and ensure that all the safety requirements have been complied and necessary control measures are in… Read More »