2024
Apr
17

Construction Machinery Maintenance & Operation Procedure for Excavator

Construction Machinery Maintenance & Operation Procedure for Excavator

Below is best procedure for heavy equipment operation and maintenance that will provide safe operating instructions for excavator operators working on any kind of projects. Overall project manager and HSE team leader have responsibilities for the implementation of this standard safety procedure.

2024
Apr
9

Gypsum Board Ceiling Method Statement

Gypsum Board Ceiling installation Method Statement

This method statement describes the method of installation of suspended gypsum board ceiling and tile ceiling in any kind of project or building. Project manager of the false ceiling subcontractor is overall responsible for the implementation of this method statement and ensure

2024
Apr
6

Fire Sprinkler System Installation Testing and Commissioning Method Statement

Fire Sprinkler System Installation Testing and Commissioning Method Statement

This procedure covers installation, pressure testing and functional commissioning of firefighting sprinkler system. Method statement covers an integrated system of underground and overhead piping designed in accordance with fire protection engineering standards. This method covers portion of the sprinkler system above ground

2024
Mar
27

Method Statement for Manhole Construction

Method Statement for Manhole Construction Method of statement

The purpose of this method statement is to define the procedure for the construction of manhole in accordance with the requirements specified in the relevant project specifications and drawings. This method statement should be implemented in conjunction with MEP method statement for

2024
Mar
18

Closed Control Unit CCU Air Conditioning Unit Installation Method Statement

This method statement covers the installation of floor mounted Close Control Units CCU with down flow air delivery serving the room. Following this procedure will ensure the CCU installation has been carried out as per project/contract specifications and manufacturer’s recommendations. The mechanical

2024
Mar
5

Condensate Drain Piping Installation and Testing Method Statement

Installation procedure for Condensate Drain pipes inside the building (uPVC Class E)

This method statement is applicable for Installation, testing  & insulation of condensate drain piping and its accessories. The scope of work covers all areas where applicable inside the buildings from hvac equipment’s and in the roof areas as applicable. Drain piping installation

2024
Feb
10

Electrical Panel Installation for LV Switchgear and Load Center

This method statement covers the electrical installation of LV switchgear and load center. Installation shall be in compliance with project electrical specifications, manufacturer instructions, applicable codes and international standards. Packaging, identification, delivery and storage shall be as per supplier recommendations and approved

error: Content is protected !!