The purpose of this civil work method statement is to outline and describe in detail the procedure such as setting and lay-out plan on actual location, laying of tiles, mixing of mortar tile grout, final laying of tiles and all other related
Read More
Below is a precise firefighting pump installation testing and commissioning method statement which is very useful as a guide for plumbing or firefighting engineers working on a construction project. Below is list of equipment and tools: Mechanical Tools Spanner Set Grooving /
Read More
The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements.
Read More
The Purpose of this procedure is to ensure that External Stone Cladding work (Marble and Granite) are executed in accordance with the contract requirements, hazards are analyzed, safety procedures implemented all quality assurance/control activities are conducted in a systematic manner, works inspected
Read More
Below is a precise dewatering method statement. Dewatering is the temporary reduction of pore pressures or groundwater levels to provide dry, stable and safe soil conditions in excavations below groundwater level. On a construction project dewatering is used to facilitate the construction
Read More
This method statement for fire fighting system covers below activities: Piping system installation Fire fighting equipment and accessories installation Installation of pumps Flushing/Cleaning of piping and equipment Installation of fire detection system and accessories Quality of installation and materials at site will
Read More
On this page you shall find method statement for electrical conduit installation. This electrical method statement covers the nature and type of work for the Gl conduits & accessories installation for the following systems as applicable on the projects. Lighting Control Small
Read More
The purpose of this document is to specify the procedure for excavation backfilling and trench preparation for installation of 132 kV cables and fiber optic Cables. Roles & Responsibilities Project Manager: Lead all construction activities and enforce strict adherence to all procedures.
Read More