Oil Storage Tank Fabrication Welding and Erection Method Statement

This tank fabrication method statement or procedure shall supplement the requirements of API 650 10th edition for construction, shop fabrications, field fabrications, welding and erection of oil storage tank for a project. In general all recommendations and suggestions advised in HSE Plan. shall be strictly adhered by all Personnel working at field and fabrication yard… Read More »

Method Statement for Repair of Concrete with Fosrocs Rendroc Materials

This concrete repairing method statement details the procedure for repairing the concrete works according to type of defects observed, in accordance with the manufacturer’s requirements. The works shall be performed as mentioned in this procedure and the quality assurance requirements shall be consistent with the relevant sections of Quality Management System Manual of the contractor… Read More »

Post Tensioned Slab Method Statement Activities

This civil construction method statement provides the control sequence in construction and methodology procedure which details the post tension activities of the post tensioned slab as per approved shop drawings. Following materials and tools to be provided for performing the post tension slab activities: Strands Galvanized Flat Ducts Anchor Blocks Stressing Blocks Wedges Denzo tape… Read More »

As Built Drawing and Documentation Project Management Procedure

This as built procedure describes the requirements for preparation of as built drawing and other project as build documentation. The purpose of this procedure is to ensure that variations from the original dimensions, design intent or materials shown on the drawings, specifications, or other documents are appropriately recorded for the purpose of producing accurate as… Read More »

Construction Quality Control Procedure for Excavation Earth Work and Back Filling (Foundations)

ACTION VERIFY  1.0     Scope This procedure provides a standardized framework for the control of excavation, earthwork and filling to ensure compliance with conditions of contract and contract specifications. 2.0     Procedure All excavation, earthwork and filling will be carried out in Project Director/ accordance with the specification detailed in the project contract documentation. In any circumstances… Read More »

Occupational Health and Safety HSE Accidents and Incidents Reporting and Investigation Procedure

This procedure describes the requirements on the notification, classification and reporting of all HSE accidents and incidents in order to ensure that notification and reporting of all accidents, incidents, diseases and dangerous occurrences is conducted in accordance with the requirement of the law and company safety reporting system. Accident Investigation is a “tool to improve… Read More »

Concrete Works Method Statement for Construction Project

This civil works method statement details general procedures for concrete works at any kind of project. This method statement for concrete works applies to all concrete work of permanent structure except lean concrete to be used as a structural fill and backfill. The normal sequence of concrete works is: Curing Bituminous Protective Painting Back Filling… Read More »

Method Statement for Cable Laying and Termination for Control and Signal Cables

The purpose of this method statement is to provide general guidelines for cable laying and cable termination for control and signal cables. Scope of this method statement covers the followings activities. material handling procedure precaution testing inspection The following documents are considered as reference documents: project standard installation drawings project specifications project quality plan (pqp)… Read More »