The purpose of this EHS procedure is to provide a framework for reducing risks to employees and protect them from the work place hazards through the implementation of Job Safety and Environmental Analysis. Scope of work for this hse procedure covers all
Read More
The purpose of this method statement is to describe the procedure and activities involved in the construction of Street light pole foundations in the project complying all contract requirements. All quality control procedures to be implemented in systematic way, works shall be
Read More
This document is intended for better understanding of the sequence of work activities to be done at site and does not replace the contractual specifications for installation of the junction box at the construction project. Ensure that all the PPE are available
Read More
This document summarizes the general details for any kind of scaffolding formwork system as well as traditional wooden forms including Fabrication, Erection, Removal, Inspection and Striking etc. The sequence of activities includes: Tying up reinforcement Concreting Curing De-shuttering Cleaning Stacking This scope
Read More
The purpose of this air duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. Duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting network. The maintenance
Read More
This method of statement specifies the detailed requirements and procedures for the grease trap installation for the building or any kind of project. Strictly follow the manufacturers Health & Safety recommendations for handling and use of the grease trap units and accessory
Read More
TABLE OF CONTENTS 1. REVISION RECORD 2. PURPOSE 3. SCOPE OF WORKS 4. REFERENCES 4.1. Contract documents 4.2. Contractors Submittal 5. DEFINITIONS / ABBREVIATIONS 5.1. Definition 5.2. Abbreviations 6. RESPONSIBILITIES 6.1. Project Manager 6.2. Site Engineer 6.3. Project Engineer 6.4. QA/QC Engineer
Read More
The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements.
Read More