2021
Oct
29

Project Environmental Safety Procedure – Job Safety and Environmental Analysis

Project Environmental Safety Procedure - Job Safety and Environmental Analysis

The purpose of this EHS procedure is to provide a framework for reducing risks to employees and protect them from the work place hazards through the implementation of Job Safety and Environmental Analysis. Scope of work for this hse procedure  covers all

2021
Oct
19

Street Light Pole Foundation Construction Method Statement

Street Light Pole Foundation Construction Method Statement

The purpose of this method statement is to describe the procedure and activities involved in the construction of Street light pole foundations in the project complying all contract requirements. All quality control procedures to be implemented in systematic way, works shall be

2021
Oct
5

Control Panel and Electrical Junction Box Installation Electrical Work Method

Gl Conduits & Accessories Installation for Electrical and ELV Services

This document is intended for better understanding of the sequence of work activities to be done at site and does not replace the contractual specifications for installation of the junction box at the construction project. Ensure that all the PPE are available

2021
Sep
16

Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

This document summarizes the general details for any kind of scaffolding formwork system as well as traditional wooden forms including Fabrication, Erection, Removal, Inspection and Striking etc. The sequence of activities includes: Tying up reinforcement Concreting Curing De-shuttering Cleaning Stacking This scope

2021
Aug
23

Grease Trap Installation Procedure

Grease Trap Installation Procedure

This method of statement specifies the detailed requirements and procedures for the grease trap installation for the building or any kind of project. Strictly follow the manufacturers Health & Safety recommendations for handling and use of the grease trap units and accessory

2021
Aug
15

Storm Drainage Water Piping Network Method Statement

Storm Drainage Piping & Sanitary Vent Installation Method Statement

TABLE OF CONTENTS 1. REVISION RECORD 2. PURPOSE 3. SCOPE OF WORKS 4. REFERENCES 4.1. Contract documents 4.2. Contractors Submittal 5. DEFINITIONS / ABBREVIATIONS 5.1. Definition 5.2. Abbreviations 6. RESPONSIBILITIES 6.1. Project Manager 6.2. Site Engineer 6.3. Project Engineer 6.4. QA/QC Engineer

2021
Aug
3

HDPE Piping System Underground Construction Method

HDPE Piping System Underground Construction Method

The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements.