Sequences and Methodology for Installation of MEP System for Water Treatment Plant

This method of statement specifies the sequences and methodology for the installation of MEP system for Water Treatment Plant. All workers associated with the installation of MEP for Water treatment plant will be responsible in accordance with the contract requirements and project specifications. All workers shall wear PPE as per risk assessment and project HSE… Read More »

Method Statement for PDA Testing On Bored Pile / Micro Pile

Below document describes instructions and guidelines for PDA Testing On Bored Piles / Micro Piles. The PDA/CAPWAP system was developed by Pile Dynamics Inc, Ohio, USA and has been in use for more than 15 years. PDA field data acquisition and computer unit has its own in-built self checking system and all force and acceleration… Read More »

Method Statement for Installation of Earthing & Lightning Protection System

This  electrical method  statement covers the nature and type of work for  the Earthing  & Lightning Protection System installation as per site requirements for the project. The piles and vertical re-bars are provided with connections for Earthing & Lightning Protection System installation by main contractor. Any core drilling, chipping, excavation and back filling work required… Read More »

Gl Conduits & Accessories Installation for Electrical and ELV Services

This  electrical method statement covers the nature and type of work for the Gl Conduits & Accessories installation for the following systems as applicable on the projects. Lighting Control Small Power Data & Voice (telephones) Security Access Control Electrics to Mechanical Services BMS/Automatic Control Roles & Responsibilities Project Manager have full authority and overall responsibility… Read More »

External Stone Cladding Installation Method Statement for Marble and Granite

The Purpose of this procedure is to ensure that External Stone Cladding work (Marble and Granite) are executed in accordance with the contract requirements, hazards are analyzed, safety procedures implemented all quality assurance/control activities are conducted in a systematic manner, works inspected and conformance is verified and documented for the project. This method statement to… Read More »

Safe Evacuation Procedure in Electrical Emergency Situation

This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital that the work should be planned in detail and risk assessments/ JSEA’s made… Read More »

Method Statement for Building Construction Site Leveling & Grading

Below is list of necessary tools and equipment for the site leveling and grading works. Hand Tools Hand Shovels Plastic Buckets Wheel Barrows Equipment’s Earth Moving Equipment’s: Grader, Excavator, Shovel etc. Tippers , Dump trucks Roller Compactor, Plate compactor Water tankers Pre Requirements Permit to Work (PTW) shall be raised for clearing, grading and levelling,… Read More »