Author Archives: admin

Method Statement for Cable Laying and Termination for Control and Signal Cables

The purpose of this method statement is to provide general guidelines for cable laying and cable termination for control and signal cables. Scope of this method statement covers the followings activities. material handling procedure precaution testing inspection The following documents are considered as reference documents: project standard installation drawings project specifications project quality plan (pqp)… Read More: Method Statement for Cable Laying and Termination for Control and… »

Concrete Works Method Statement for Construction Project

This civil works method statement details general procedures for concrete works at any kind of project. This method statement for concrete works applies to all concrete work of permanent structure except lean concrete to be used as a structural fill and backfill. The normal sequence of concrete works is: Curing Bituminous Protective Painting Back Filling… Read More: Concrete Works Method Statement for Construction Project »

Tower Crane Construction / Crane Erection Method Statement

The purpose of this project civil method statement is to define the procedure for the erection of tower crane. All work will be done in accordance with the requirements specified in the relevant specifications, technical procedures and approved drawings. This Method Statement applies to the supply and delivery of tower crane components, the movements of… Read More: Tower Crane Construction / Crane Erection Method Statement »

Structured Cable Installation Method Statement

Below is an electrical method statement for the installation of structured cable / network cabling system (IPTV, MC, CCTV & ACCESS CONTROL) as per the project specifications and manufacturer installation instructions. System is also known as it structured cabling. Arrange below tools and tackles: Electrician toolbox Hand Tools such as Crimping Tools, Cable cutters etc.… Read More: Structured Cable Installation Method Statement »

Fabrication and Erection of Hot dip Galvanized Primary and Secondary Steel Structure

This procedure describes the minimum requirements that shall be observed at site for handling and storing materials, erection of hot dip galvanized primary and secondary steel structure to be installed. It also covers the tests and inspections that are to be carried out during the execution of the fabrication, erection and assembly works. This procedure… Read More: Fabrication and Erection of Hot dip Galvanized Primary and Secondary… »

Micropile Installation Method Statement

Below is a precise method statement for micropile construction using the latest technology. Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which has a higher strength and/or workability shall also be allowed depending upon the consultant approval. Grout Mix The proportions of grout and… Read More: Micropile Installation Method Statement »

Waterproofing Method Statement for Pile Head Blinding Walls & Water Tank

The purpose of this civil work method statement is to define the procedure of the waterproofing works for underground water tanks and basement in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. Scope of this method statement is for the water proofing works… Read More: Waterproofing Method Statement for Pile Head Blinding Walls & Water… »

Decorative Plaster Method Statement

The purpose of this method statement is to ensure that decorative plaster work and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. Project Manager shall be responsible for… Read More: Decorative Plaster Method Statement »