2025
Jun
15

Task Specific Safe Work Method Statement Template

Type of Task:_____________________________________________ Date: Prepared By: Position: Company: Description of works: Location of activity: Approximate duration of the activity:     Commencement: Risk Assessment Ref: Operations Controls Covered                              

2025
Jun
5

Project Safety Training Awareness and Competence Requirements

Project safety training is mandatory for all project personnel. Safety training program is completed on the projects in accordance with the requirements of documented training procedure of an organization. Here we are identifying some necessary requirements. The Management of Health and Safety

2025
May
31

Method statement for Receiving and Incoming Material Inspection On Construction Project Site

Below is a method statement which is helpful for defining the procedure for receiving and inspecting incoming materials on the project construction site including the concrete inspection. The purpose of this method statement is is to define the procedure for receiving and

2025
May
30

Risk Management Process and Plan for Construction Project – HSE

Below is a steps wise risk management process that consists of hazard identification, risk assessment, risk control, analysis and improvement. The overall responsibility for the implementation of this procedure is with the project manager and safety and other department heads. Below are

2025
May
13

Safety Statement Occupational Health and Safety OHS Policy & HSE KPI For Construction Company

General Safety Statement Everyone who comes to work in the morning has the right to go home safely at the end of the duty / shift. It is essential that the“Walk the Talk” approach be the Primary objective to executing a task

2025
May
5

Slab Deflection Test Method Statement Procedure

Slab Deflection Test Method Statement

This Method Statement details general procedure for slab deflection testing on any kind of project or building. Project Manager has the overall responsibility for the implementation of this method statement and shall well ensure that the Independent Testing Agency and as well

2025
Apr
3

Honeycombing, Shrinkage Cracks, Tie-Rod Holes and Blowholes Concrete Repairing Method Statement

honeycomb in concrete repair

The purpose of this honeycomb repair method statement is to define the procedure for the sequence of repairing of concrete defects, considering all safety and quality requirements. This procedure is written in order to present the method to be used for repairing