This civil construction method statement provides the control sequence in construction and methodology procedure which details the post tension activities of the post tensioned slab as per approved shop drawings. Following materials and tools to be provided for performing the post tension
Read More
The purpose of this method statement is to provide general guidelines for cable laying and cable termination for control and signal cables. Scope of this method statement covers the followings activities. material handling procedure precaution testing inspection The following documents are considered
Read More
This civil works method statement details general procedures for concrete works at any kind of project. This method statement for concrete works applies to all concrete work of permanent structure except lean concrete to be used as a structural fill and backfill.
Read More
The purpose of this project civil method statement is to define the procedure for the erection of tower crane. All work will be done in accordance with the requirements specified in the relevant specifications, technical procedures and approved drawings. This Method Statement
Read More
Below is an electrical method statement for the installation of structured cable / network cabling system (IPTV, MC, CCTV & ACCESS CONTROL) as per the project specifications and manufacturer installation instructions. System is also known as it structured cabling. Arrange below tools
Read More
This procedure describes the minimum requirements that shall be observed at site for handling and storing materials, erection of hot dip galvanized primary and secondary steel structure to be installed. It also covers the tests and inspections that are to be carried
Read More
Below is a precise method statement for micropile construction using the latest technology. Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which has a higher strength and/or workability shall also be
Read More
The purpose of this civil work method statement is to define the procedure of the waterproofing works for underground water tanks and basement in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the
Read More