The purpose of this document is to specify the procedure for excavation backfilling and trench preparation for installation of 132 kV cables and fiber optic Cables. Roles & Responsibilities Project Manager: Lead all construction activities and enforce strict adherence to all procedures.
Read More
Below is list of necessary tools and equipment for the site leveling and grading works. Hand Tools Hand Shovels Plastic Buckets Wheel Barrows Equipment’s Earth Moving Equipment’s: Grader, Excavator, Shovel etc. Tippers , Dump trucks Roller Compactor, Plate compactor Water tankers Pre
Read More
The user acceptance tests will demonstrate that the system and related materials have been correctly installed and that the footfall system will operate in a manner that will enable client to accept it as a working system and proceed with the process
Read More
This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital
Read More
The aim of this method statement is to describe electrical works associated with installation of earthing / grounding system, lightning surge protection systems. The grounding & lightning protection system are designed to ensure the complete safety of both persons and equipment throughout
Read More
This parapet method statement will help to describe the procedure to for parapet wall and parapet roof construction works, that ultimately will ensure that the work is planned and performed in accordance with project technical specifications and drawings. The project manager will
Read More
Below standard work instruction addresses the training of new boom truck operators including the refresher awareness and training of experienced operator. This instruction applies to all operators of boom trucks on construction project sites. All Boom Truck operators must hold a valid
Read More
Below is the best sheet pile method statement that describes the method and procedures involved in the installation of sheet pile wall (as per approved drawings) as temporary shoring and facilitate the work relating to the construction works. The technical specification and
Read More