Civil Method Statement for AAC Block Masonry Works

The purpose of this method of statement is to provide general instructions for AAC Block masonry works at a construction project site. This work procedure covers AAC masonry work to be executed in the substructures/super structures of different buildings as specified in the approved drawings. AAC Concrete blocks (light weight) shall generally conform to local… Read More »

Heavy Duty Tyre Mounting Method

Below is a brief instruction that is applicable to all project sites where heavy-duty tyres are in use. Repairing and replacing heavy-duty wheel assemblies presents a safety hazard because of the size and varying types of rubber tyred equipment. This Instruction outlines the safe methods to be followed in mounting heavy-duty tyres and rims. Project… Read More »

Diesel Generator Installation Method Statement

Below is a precise electrical method statement that describes the procedure for diesel generator installation on a project. The work methods are summarized as follows: Preparation of the Works Delivery and inspection of Generator upon delivery at site Setting out of works Installation of Diesel Generator Inspection of Generator Set Below is list of tools… Read More »

Method Statement for Water Supply PPR & Pex Piping Installation

This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been… Read More »

Roof Water Proofing Procedure Using Waterproof Membranes

The scope of this procedure comprises the control of waterproof membranes installation and application on flat and inclined substrates. The condition and moisture content of the substrate will be inspected and accepted by the subcontractor before commencement of waterproofing works on site. A meeting will be held with specialist subcontractor to discuss the scope, sequence… Read More »

Project Environmental Safety Procedure – Job Safety and Environmental Analysis

The purpose of this EHS procedure is to provide a framework for reducing risks to employees and protect them from the work place hazards through the implementation of Job Safety and Environmental Analysis. Scope of work for this hse procedure  covers all construction project activities. Hazard is any condition or practice with the potential for… Read More »

Street Light Pole Foundation Construction Method Statement

The purpose of this method statement is to describe the procedure and activities involved in the construction of Street light pole foundations in the project complying all contract requirements. All quality control procedures to be implemented in systematic way, works shall be inspected, conformance verified and documented. Applicable health and safety precautions are implemented throughout… Read More »

Control Panel and Electrical Junction Box Installation Electrical Work Method

This document is intended for better understanding of the sequence of work activities to be done at site and does not replace the contractual specifications for installation of the junction box at the construction project. Ensure that all the PPE are available with the crew involved in the job. All required equipment and tools should… Read More »