2024
Apr
28

Haul Truck / Dump Truck Safety, Loading and Dumping Procedure

Haul Truck Dump Truck Safety, Loading and Dumping Procedure

The purpose of this construction safety procedure is to provide safe operating instructions for haul truck and dump truck operators working on any kind of projects including building and road construction machinery. This Instruction applies to projects and offices where a company

2024
Apr
17

Construction Machinery Maintenance & Operation Procedure for Excavator

Construction Machinery Maintenance & Operation Procedure for Excavator

Below is best procedure for heavy equipment operation and maintenance that will provide safe operating instructions for excavator operators working on any kind of projects. Overall project manager and HSE team leader have responsibilities for the implementation of this standard safety procedure.

2023
Aug
28

Toolbox Talk Topics for 19 Activities

toolbox talk topics for construction project safety talks

Below we have listed 19 toolbox talk topics with briefing which should take place during the daily safety meeting. Below is table of content which is covered in this post about the safety meeting topics. Sun Safety Work at height Mobile scaffolds

2022
Nov
7

Method of Statement for Structural Excavation and Backfilling

The purpose of this method statement is to define the standard work process for Structural Excavation and Backfilling related activities. Method of statement addresses work operation associated with structural excavation and backfilling. All necessary setting out, tree cutting, clearing and grubbing will

2022
Sep
29

Workplace Smoking Policy for Construction Company

It is the Company’s policy that all of its workplaces are smoke-free and that all employees have a right to work in a smoke-free environment and not be exposed to second-hand smoke. This is also a statutory requirement. As such, the Company’s

2022
May
25

Construction Project Site Clearance Method

Construction Project Site Clearance Method

The purpose of this method is to give guidance for the clearing operation for all site areas where clearing is required. Instruction applies to all areas and is not limited to clearing for dump areas, haul roads and pits. This safework instruction

2022
Mar
3

Demolition Method Statement for Covered Walkway

Demolition Safework Method Statement

Below is a brief method statement that is for the demolition of existing covered walkway. Existing structure shall be removed completely, which is a cantilevered structure supported by steel elements and covered with roof tiles. Below is list of equipment for demolition