This document summarizes the general details for any kind of scaffolding formwork system as well as traditional wooden forms including Fabrication, Erection, Removal, Inspection and Striking etc. The sequence of activities includes: Tying up reinforcement Concreting Curing De-shuttering Cleaning Stacking This scope
Read More
This method of statement specifies the detailed requirements and procedures for the grease trap installation for the building or any kind of project. Strictly follow the manufacturers Health & Safety recommendations for handling and use of the grease trap units and accessory
Read More
TABLE OF CONTENTS 1. REVISION RECORD 2. PURPOSE 3. SCOPE OF WORKS 4. REFERENCES 4.1. Contract documents 4.2. Contractors Submittal 5. DEFINITIONS / ABBREVIATIONS 5.1. Definition 5.2. Abbreviations 6. RESPONSIBILITIES 6.1. Project Manager 6.2. Site Engineer 6.3. Project Engineer 6.4. QA/QC Engineer
Read More
The purpose of this method is to provide guidance for assessing the installation activities for underground HDPE piping systems including but not limited to excavation & joining methods to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements.
Read More
Below is a precise firefighting pump installation testing and commissioning method statement which is very useful as a guide for plumbing or firefighting engineers working on a construction project. Below is list of equipment and tools: Mechanical Tools Spanner Set Grooving /
Read More
The purpose of this civil work method statement is to outline and describe in detail the procedure such as setting and lay-out plan on actual location, laying of tiles, mixing of mortar tile grout, final laying of tiles and all other related
Read More
This standard document describes the permit to work system to control potentially high risk hot work operations through the issue of a Hot Work Permit. By implementing this safe work instruction organization shall ensure a safe place to work when undertaking hot
Read More
This method of statement specifies the sequences and methodology for the installation of MEP system for Water Treatment Plant. All workers associated with the installation of MEP for Water treatment plant will be responsible in accordance with the contract requirements and project
Read More