Waterproofing Method Statement for Pile Head Blinding Walls & Water Tank

The purpose of this civil work method statement is to define the procedure of the waterproofing works for underground water tanks and basement in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the

2021
Nov
11

Roof Water Proofing Procedure Using Waterproof Membranes

Roof Water Proofing Procedure Using Waterproof Membranes

The scope of this procedure comprises the control of waterproof membranes installation and application on flat and inclined substrates. The condition and moisture content of the substrate will be inspected and accepted by the subcontractor before commencement of waterproofing works on site.