Fan Coil FCU Unit Installation Method Statement

Below is a precise method statement for fan coil unit FCU installation for any kind of project. Project manager is overall responsible for the implementation of this method and all applicable standards, specifications and manufacturer instructions for the FCU installation. Site engineer/ supervisor shall make sure that all necessary documentation work is approved, shop drawings/… Read More »

Water Heater Installation | Geyser Installation Method Statement

This page gives a brief method statement for water heater installation or geyser installation in compliance with the approved design, drawings, approved material submittals and project specification. Prior to installation of Water Heater, the supervisor and foreman will verify and ensure that all the safety requirements have been complied and necessary control measures are in… Read More »

Method Statement for 1” Fire Hose Reel System and 1 ½” Fire Hose System Installation

This method statement covers installation and inspection of 1” Fire Hose Reel System and 1 ½” Fire Hose System which is part of overall firefighting system. Purpose of this method of statement is to define the method of installation and inspection of Fire Fighting Hose Reel System. Quality of installation and materials at site will… Read More »

Refrigerant Copper Piping Installation Method Statement

The purpose of this mechanical method statement is to identify the requirements/methodology for installation of refrigerant copper piping as per the contract specification, drawings and as per the applicable regulations if any. This method statement is applicable to all activities related to installation of refrigerant copper piping for Ducted Split and Decorative Units. The implementation… Read More »

Wave Propagation Pile Testing Types and Methods

In the 1950’s, E.A. Smith of  the Raymond Pile Driving Company studied wave propagation on slender rods, and developed a numerical analysis method to predict the capacity versus blow count relationship and investigate pile driving stresses. The model mathematically represents the hammer and all its accessories (ram, cap, cap block), as well as the pile,… Read More »

Toolbox Talk Topics for 19 Activities

Below we have listed 19 toolbox talk topics with briefing which should take place during the daily safety meeting. Below is table of content which is covered in this post about the safety meeting topics. Sun Safety Work at height Mobile scaffolds Portable electric equipment Coshh PPE-Head PPE-Hand PPE-Foot PPE-Hearing PPE-Eye Accident reporting Fire Precautions… Read More »

Hydrotest Pipe Pressure Testing Procedure

This mechanical method statement section applies to the hydrostatic testing of new fabricated and installed stainless steel SS pipelines associated with a construction or pipeline project. After completion and approval of all welding, radiography and NDT requirements/ activities the piping system shall be hydrostatically pressure tested. The site supervisor shall obtain relevant safety permits to… Read More »

UPS Installation Procedure Specification Requirements

This specification document covers uninterruptible power supply UPS system Supply, installation, testing and commissioning of capacities as shown on the related drawings. The UPS system shall operate in conjunction with the building electrical system and the generator to provide high quality power for critical equipment loads such as data and computer servers and related equipment,… Read More »