This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital
Read More
Below standard work instruction addresses the training of new boom truck operators including the refresher awareness and training of experienced operator. This instruction applies to all operators of boom trucks on construction project sites. All Boom Truck operators must hold a valid
Read More
This tank fabrication method statement or procedure shall supplement the requirements of API 650 10th edition for construction, shop fabrications, field fabrications, welding and erection of oil storage tank for a project. In general all recommendations and suggestions advised in HSE Plan.
Read More
ACTION VERIFY 1.0 Scope This procedure provides a standardized framework for the control of excavation, earthwork and filling to ensure compliance with conditions of contract and contract specifications. 2.0 Procedure All excavation, earthwork and filling will be carried out in Project Director/
Read More
This procedure describes the requirements on the notification, classification and reporting of all HSE accidents and incidents in order to ensure that notification and reporting of all accidents, incidents, diseases and dangerous occurrences is conducted in accordance with the requirement of the
Read More
This as built procedure describes the requirements for preparation of as built drawing and other project as build documentation. The purpose of this procedure is to ensure that variations from the original dimensions, design intent or materials shown on the drawings, specifications,
Read More
Quality Policy Statement We will provide our customers with the highest quality of products and services to meet their requirements and maintain our position as a leading company in the field of construction. Through our commitment and compliance with the requirements of
Read More
Type of Task:_____________________________________________ Date: Prepared By: Position: Company: Description of works: Location of activity: Approximate duration of the activity: Commencement: Risk Assessment Ref: Operations Controls Covered
Read More