The purpose of this document is to specify the procedure for excavation backfilling and trench preparation for installation of 132 kV cables and fiber optic Cables. Roles & Responsibilities Project Manager: Lead all construction activities and enforce strict adherence to all procedures.
Read More
The user acceptance tests will demonstrate that the system and related materials have been correctly installed and that the footfall system will operate in a manner that will enable client to accept it as a working system and proceed with the process
Read More
This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital
Read More
The aim of this method statement is to describe electrical works associated with installation of earthing / grounding system, lightning surge protection systems. The grounding & lightning protection system are designed to ensure the complete safety of both persons and equipment throughout
Read More
The purpose of this method statement is to provide general guidelines for cable laying and cable termination for control and signal cables. Scope of this method statement covers the followings activities. material handling procedure precaution testing inspection The following documents are considered
Read More
Below is an electrical method statement for the installation of structured cable / network cabling system (IPTV, MC, CCTV & ACCESS CONTROL) as per the project specifications and manufacturer installation instructions. System is also known as it structured cabling. Arrange below tools
Read More
Below is a precise method of statement for electrical works, that explains and covers the installation & inspection of 11KV switchgear panels on already approved and ready base/plinth. Switchgear installation shall be done in compliance with the project electrical specifications and switchgear
Read More
This document describes the methodology for installation of MCC, ACB and control panels in any kind of the project, also to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources. By following this electrical method statement
Read More