Category Archives: Construction Quality Control Procedures

If you are looking for Construction Quality Control Procedures in pdf or doc format then this web-page is for you.

Air Cooled Condenser Erection and Assembly Method Statement

This document describes the methods proposed to be used for the erection operations related to the air cooled condenser for any kind of plant project. Method statement identifies the general steps, arrangements and precautions for the assembly and erection works of ACC. This method statement also defines piping erection of all control equipment at the… Read More »

Chemical Flushing for Chilled Water System

Below is a detailed chilled water pipe flushing procedure that covers cleaning, flushing and chemical treatment requirements for an existing or new project. Flushing of chilled water system shall be done as per the guidelines and requirements mentioned in the project specifications and relevant drawings etc. Also instructions given from the chemical manufacturer and suppliers… Read More »

Method of Statement for Structural Excavation and Backfilling

The purpose of this method statement is to define the standard work process for Structural Excavation and Backfilling related activities. Method of statement addresses work operation associated with structural excavation and backfilling. All necessary setting out, tree cutting, clearing and grubbing will be completed prior to performing this operation. This work consists of excavation for… Read More »

Chilled Water Piping Installation Pressure Testing & Insulation Method Statement

This mechanical method statement covers the nature and type of work for the installation of chilled water CHW piping and Accessories in the project building and the frequency on which the inspections are to be carried out. The method also covers the installation and inspection of Chilled Water Piping including Accessories. All the materials delivered… Read More »

Aggregate Shape Test to find Flakiness Index Elongation Index and Angularity Number

The purpose of this document is to describe the method for determining Flakiness Index, Elongation Index and Angularity Number of the given sample of aggregate. The particle shape of aggregate is determined by percentages of flaky and elongated particles contained in it. In case of gravel it is determined by its angularity number. For base… Read More »

Batching Plant Best Practices for Batching of Concrete

The scope of this procedure covers best practices and checks for carrying out prior to and during the site batching of concrete. Checks prior to commencement of concrete batching activity: Basic constituents of concrete viz. cement, coarse and fine aggregates shall comply with the contract specifications. In case of large projects and where specified, a… Read More »

As Built Drawing and Documentation Project Management Procedure

This as built procedure describes the requirements for preparation of as built drawing and other project as build documentation. The purpose of this procedure is to ensure that variations from the original dimensions, design intent or materials shown on the drawings, specifications, or other documents are appropriately recorded for the purpose of producing accurate as… Read More »

Construction Quality Control Procedure for Excavation Earth Work and Back Filling (Foundations)

ACTION VERIFY  1.0     Scope This procedure provides a standardized framework for the control of excavation, earthwork and filling to ensure compliance with conditions of contract and contract specifications. 2.0     Procedure All excavation, earthwork and filling will be carried out in Project Director/ accordance with the specification detailed in the project contract documentation. In any circumstances… Read More »