Introduction to Excavation and Use of Heavy Equipment for Basement Construction

In general, excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include backfilling with new or original materials to voids, spreading and levelling over an area. British Standard CP6031 gives standards and recommendation to earthworks covering embarkment and cuttings, levelling and… Read More »

Copper Pipe Installation Method of Statement for Water Supply

Below plumbing method statement describes the procedure for the installation of copper pipe for domestic water services (hot & cold) inside buildings for any kind of the building construction project. Overall project manager is responsible for the implementation of this copper pipe installation method statement. By following this MOS project team will ensure that plumbing installation… Read More »

method statement for drainage pipe installation

The purpose of this plumbing method statement is to define the task and introduce correct practices in order to ensure that the drainage piping job execution will meet the project requirements under the safe system of work. Procedure covers both metallic and non metallic drainage piping installations. Before starting the drainage installation work arrange necessary… Read More »

Haul Truck / Dump Truck Safety, Loading and Dumping Procedure

The purpose of this construction safety procedure is to provide safe operating instructions for haul truck and dump truck operators working on any kind of projects including building and road construction machinery. This Instruction applies to projects and offices where a company operates and areas where haul trucks are in use. Project manager and project… Read More »

Construction Machinery Maintenance & Operation Procedure for Excavator

Below is best procedure for heavy equipment operation and maintenance that will provide safe operating instructions for excavator operators working on any kind of projects. Overall project manager and HSE team leader have responsibilities for the implementation of this standard safety procedure. All excavator operators must, hold a valid accredited 3rd party competence certificate and… Read More »

Gypsum Board Ceiling Method Statement

This method statement describes the method of installation of suspended gypsum board ceiling and tile ceiling in any kind of project or building. Project manager of the false ceiling subcontractor is overall responsible for the implementation of this method statement and ensure that the supervisory staff allocated for this work and all resources are in… Read More »

Method Statement for Manhole Construction

The purpose of this method statement is to define the procedure for the construction of manhole in accordance with the requirements specified in the relevant project specifications and drawings. This method statement should be implemented in conjunction with MEP method statement for pipe laying. All the procedures shall comply with the requirements of the municipality… Read More »

Condensate Drain Piping Installation and Testing Method Statement

This method statement is applicable for Installation, testing  & insulation of condensate drain piping and its accessories. The scope of work covers all areas where applicable inside the buildings from hvac equipment’s and in the roof areas as applicable. Drain piping installation shall be done as per the latest approved shop drawings for the required… Read More »