The Purpose of this procedure is to ensure that External Stone Cladding work (Marble and Granite) are executed in accordance with the contract requirements, hazards are analyzed, safety procedures implemented all quality assurance/control activities are conducted in a systematic manner, works inspected
Read More
Below is a precise dewatering method statement. Dewatering is the temporary reduction of pore pressures or groundwater levels to provide dry, stable and safe soil conditions in excavations below groundwater level. On a construction project dewatering is used to facilitate the construction
Read More
On this page you shall find method statement for electrical conduit installation. This electrical method statement covers the nature and type of work for the Gl conduits & accessories installation for the following systems as applicable on the projects. Lighting Control Small
Read More
The purpose of this document is to specify the procedure for excavation backfilling and trench preparation for installation of 132 kV cables and fiber optic Cables. Roles & Responsibilities Project Manager: Lead all construction activities and enforce strict adherence to all procedures.
Read More
Below is list of necessary tools and equipment for the site leveling and grading works. Hand Tools Hand Shovels Plastic Buckets Wheel Barrows Equipment’s Earth Moving Equipment’s: Grader, Excavator, Shovel etc. Tippers , Dump trucks Roller Compactor, Plate compactor Water tankers Pre
Read More
The user acceptance tests will demonstrate that the system and related materials have been correctly installed and that the footfall system will operate in a manner that will enable client to accept it as a working system and proceed with the process
Read More
This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital
Read More
This parapet method statement will help to describe the procedure to for parapet wall and parapet roof construction works, that ultimately will ensure that the work is planned and performed in accordance with project technical specifications and drawings. The project manager will
Read More