Trench Preparation Excavation and Backfill Method Statement for Electric Underground Cable Laying

The purpose of this document is to specify the procedure for excavation backfilling and trench preparation for installation of 132 kV cables and fiber optic Cables. Roles & Responsibilities Project Manager: Lead all construction activities and enforce strict adherence to all procedures. Site Manager: Lead the construction activities at site and report to the Project… Read More »

Method Statement for Cable Laying and Termination for Control and Signal Cables

The purpose of this method statement is to provide general guidelines for cable laying and cable termination for control and signal cables. Scope of this method statement covers the followings activities. material handling procedure precaution testing inspection The following documents are considered as reference documents: project standard installation drawings project specifications project quality plan (pqp)… Read More »