2024
Dec
31

Introduction to Excavation and Use of Heavy Equipment for Basement Construction

use of sheet pile to protect excavation of cut

In general, excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include backfilling with new or original materials to voids, spreading and levelling over an area. British Standard

2024
Oct
3

Job Description of Technical Department Manager Civil Construction Company

Responsibilities of Technical Manager of Construction Company

Lead the department activities related to projects and corporate office / head office. Raise suggestions to improve the system of working within the project and the company. Follow the relevant procedures of the quality management system. Raise NCR to the non-conforming procedures

2024
Jul
1

Method Statement for Stormwater Drainage

Below is precise method statement for drainage works covering sanitary, vent and stormwater pipes. Stormwater drainage is an important system for any kind of construction project. This plumbing method statement covers the installation of sanitary, vent and stormwater drainage piping system. The

2024
Jun
19

Copper Pipe Installation Method of Statement for Water Supply

Below plumbing method statement describes the procedure for the installation of copper pipe for domestic water services (hot & cold) inside buildings for any kind of the building construction project. Overall project manager is responsible for the implementation of this copper pipe installation

2024
Jun
9

Electrical Switchgear Installation Method Statement for 11KV HV Panel

Below is a precise method of statement for electrical works, that explains and covers the installation & inspection of 11KV switchgear panels on already approved and ready base/plinth. Switchgear installation shall be done in compliance with the project electrical specifications and switchgear

2024
Jun
6

MCC, ACB and Control Panels Installation Method Statement

MCC, ACB and Control Panels Installation Method Statement

This document describes the methodology for installation of MCC, ACB and control panels in any kind of the project, also to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources. By following this electrical method statement

2024
Apr
28

Haul Truck / Dump Truck Safety, Loading and Dumping Procedure

Haul Truck Dump Truck Safety, Loading and Dumping Procedure

The purpose of this construction safety procedure is to provide safe operating instructions for haul truck and dump truck operators working on any kind of projects including building and road construction machinery. This Instruction applies to projects and offices where a company